AIU Mini Courses

Earned Value Management (EVM)

Courses 2+ hours

Earned Value Management (EVM)
Variance analysis, Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), Actual Cost of Work Performed (ACWP), Cost variance (CV), Schedule variance (SV)

Share this Course

Course Description:

Welcome to EVM Essentials, a concise yet comprehensive course offered by AIU designed to equip you with the fundamental skills in Earned Value Management (EVM). In this dynamic course, you’ll learn how to effectively measure project performance and progress in terms of scope, time, and cost using EVM techniques. Led by AIU’s expert instructors, you’ll explore the core principles of EVM, including key metrics such as budgeted cost of work scheduled (BCWS), budgeted cost of work performed (BCWP), and actual cost of work performed (ACWP). Through interactive modules and real-world examples, you’ll discover how to calculate performance indices like the cost performance index (CPI) and schedule performance index (SPI) to assess project health and identify areas for improvement. Whether you’re a seasoned project manager looking to enhance your skills or a newcomer to the field seeking to grasp the essentials of project performance measurement, EVM Essentials is your gateway to success. Join us at AIU and unlock the power of EVM to drive project success and achieve your professional goals.

Course Topics

Lesson 1: What is Earned Value Management? | EVM | CV, SV, CPI, SPI, EAC, ETC, TCPI, VAC | PMP Exam
Earned Value Management or EVM
Start Lesson
Lesson 2: Introduction to Cost and Management Accounting, Accounting Step-by-Step by Mike Werner
Introduction to Cost and Management
Start Lesson
Lesson 3: 5. Insurance, the Archetypal Risk Management Institution, its Opportunities and Vulnerabilities
Financial Markets (2011) (ECON 252)
Start Lesson
Lesson 4: Lecture 1: Introduction to Development Economics
MIT 14.771 Development Economics, Fall
Start Lesson
Lesson 5: Agile Project Management with Kanban | Eric Brechner | Talks at Google
There's a way to organize
Start Lesson
Lesson 6: FE Exam Review: Engineering Economics (2018.09.12)
Lesson 7: Lecture 17 : Estimating Project Budgets
In this video, we will
Start Lesson
Lesson 8: Innovation in business education by Prof Kenneth Mwenda
Prof Kenneth Mwenda delivers a
Start Lesson

AIU Success Stories

Contact Us Today!

Begin Your Journey!
AIU’s Summer of Innovation and Growth gives you the ability to earn up to $5000 in tuition credit by completing free lessons and courses.
Whether you’re looking to acquire new skills, advance your career, or simply explore new interests, AIU is your gateway to a world of opportunities. With free access to 3400 lessons and hundreds of courses the ability to earn credits and earn certificates there’s no better time to start learning.
Join us today as a Guest Student and take the first step towards a brighter, more empowered future.
Explore. Learn. Achieve.

Course Outcomes:

Doctor of Travel and Tourism

Create a Free Guest Student Account

AIU Faculty:

Dr. Edgar Colon

Dr. Edgar Colon

Academic Advisor

  With excellent background in the sciences and medicine, Dr. Colon...

Lynet Davidson

Lynet Davidson

Lecturer

An experienced lawyer with a strong analytical mindset and passion...

Manuel A Patino

Manuel A Patino

Lecturer

Psicólogo y profesor de yoga certificado con estudios en psiconeuroinmunologí­a...

Tobias Roberts

Tobias Roberts

Lecturer

Universidad Evangélica Nicaragüense Martin Luther King Master of Arts (MA),...

Niavo Landihajaina Ratsimbazafy

English Teaching Program Antananarivo (ETP) English- Level Advanced (Score TELP...

Albina Mehmeti

Albina Mehmeti

Lecturer

As an architect of 2 years experience in a local...

Cyndy Dominguez

Cyndy Dominguez

Academic Tutor

I want to be part of the success in an...

Bairbre Hassett

Bairbre Hassett

Lecturer

University of Limerick Master of Arts (MA), Sport Psychology 2017-2018...

Bahadir Bozoglan

Bahadir Bozoglan

Lecturer

Ph.D. in Psychological Counseling and Guidance, Senior Academic Researcher, Reviewer,...

Jay Bachahally Radhakrishnan Vijayasimha

Top Rated (official Upwork badge) full-time freelancer and I focus...

Dr. Olga C. Fontes

Dr. Olga C. Fontes

Academic Advisor

 Olga is an Academic Advisor at AIU. She is a very...

Dr. Prakash Menon

Dr. Prakash Menon

Academic Advisor

Over twenty years of diverse supply chain, business systems and...

Asha Smith

Asha Smith

Lecturer

Georgia State University Master of Arts (MA), Applied Linguistics 2020-2023...

Ángela-Jo Touza-Medina

Global Nonprofit & Social Impact Consultant | HR & Talent...

Jose Manuel Juanas

Universitat Pompeu Fabra Master’s degree, Compulsory Secondary Education 2015-2016 Universitat...

Bojana Ristic

Bojana Ristic

Lecturer

Basque Center on Cognition, Brain and Language & University of...

Antreas Naziris

Antreas Naziris

Lecturer

a Phd graduate in Electrical and Electronic Engineering. My spectrum...

Pilar Cepeda

Pilar Cepeda

Lecturer

Spanish | Project Manager | Customer Service | 8+ Exp.

Nick Karim

Nick Karim

Academic Advisor

    Dr. Karim has been in the Field of Education for...

Diana Ugalde

Diana Ugalde

Lecturer

I am a research engineer with a background in Food...

Juan Pablo Sanchez Lorenzo

IT Manager | Cybersecurity Analyst | Programmer

Safet Mutapcija

Safet Mutapcija

Lecturer

MEng in geotechnical engineering and BEng in engineering geology Experience...

Maria Jaramillo

Maria Jaramillo

Lecturer

Universidad de La Rioja Bachelor of Education (BEd), CLIL Metodology...

Muhammad Usama Jamil

llama Iqbal Medical College Lahore, Pakistan Bachelor of Medicine, Bachelor...

Sergen Bayram

Sergen Bayram

Lecturer

Ondokuz Mayis Üniversitesi Bachelor of Business Administration (BBA), Business 2011-2016

Carmen Solórzano

a University professor and chair in sustainable rural development and...

Abdulkadir Dogan

Abdulkadir Dogan

Lecturer

Ph.D. Economist mainly specialized in macroeconomics, financial market, data analysis...

Rebecca Taylor

Rebecca Taylor

Lecturer

I am a Registered Nutritionist with a BSc in Nutrition...

Luis Aliaga

Luis Aliaga

Lecturer

a highly experienced engineer focused in the renewable energy area,...

Dr. Randall Raus

Dr. Randall Raus

Academic Advisor

Randall is an Academic Advisor at AIU. He is a...

Silvana Mici

Silvana Mici

Lecturer

counseling psychologist graduated in Msc Counseling Psychology and Pedagogy”

Miriam James

Miriam James

Academic Tutor

OBJECTIVES: To obtain more knowledge and become a role model...

Dr. Darian Schiffman

Dr. Darian Schiffman

Academic Advisor

Silvia is one of our Academic Advisors at AIU. As...

Rene Cordon

Rene Cordon

Academic Advisor

P R O F E S S I O N...

Muhammad Saghir

Muhammad Saghir

Lecturer

University of Balochistan Quetta Pakistan Master of Commerce (MCom), Commerce...

Pablo Mora

Pablo Mora

Lecturer

Desarrollador certificado por AWS y de aplicaciones de Kubernetes con...

Dr. Nilani Ljunggren

Dr. Nilani Ljunggren

Academic Advisor

Nilani Ljunggren De Silva, PhD Researcher   EDUCATION:           Ph.D. in...

Daniela Carrillo

Daniela Carrillo

Lecturer

Su pasión por la educación y el trabajo con niños...

Liz Angie Paredes

Facebook Ads Media Manager | Digital Marketing | Lead Generation

Garett Reid

Garett Reid

Lecturer

Sports and Fitness Writer.

Arhely Espinoza

Arhely Espinoza

Academic Tutor

  Arhely Espinoza is a Tutor at Atlantic International University. She is a very...

Mark Alfons

Mark Alfons

Lecturer

Mark Alfons has a vast expertise in: 1. Anxiety, Bipolar,...

Syeda Batool Zaidi

Certified Professional Resume Writer | HR | LinkedIn Branding

Daniel Fernando Rozo Oviedo

Acerca de Daniel Fernando Rozo Oviedo: B.S.c Fí­sico M.S.c Ingeniero...

Sumaiya Parveen

Sumaiya Parveen

Lecturer

An expert accountant and statistics tutor with 3+ years of...

Muhammad Al Fayshal Shiraj

Mechanical Designer in various machinery industries. Graduated from a top...

Dr. Andreas Rissler

Dr. Andreas Rissler

Academic Advisor

Andreas is one of our Academic Advisors and Admission Counselors...

Dr. Freddy Frejus

Dr. Freddy Frejus

Academic Advisor

Dr. Freddy Frejus – academic  advisor at AIU  Freddy Frejus...

Carlos Eduardo Hutchings

As a mathematics tutor with more than 7 years of...

Shafaqat Siddique

IT Specialist (DEV OPS) Team Lead, Information Security Researcher, Malware...

Faith Caube

Faith Caube

Lecturer

University of the Philippines Manila Bachelor of Science (BS), Occupational...

Dirk Witte

Dirk Witte

Lecturer

Dirk Witte Permaculture design, foraging, herbal-ism and food security. Permaculture...

Muhammad Waleed

Muhammad Waleed

Lecturer

Accounting Tutor | Economics Tutor | Managerial Accounting Tutor

Dr. Omer Farooq Khan

a Doctor with clinical experience in Child healthcare & I...

Victor Marin

Victor Marin

Lecturer

SR. Rsch. | Acad. & Tech. Writ. | B.Sc. Psych....

Leonardo Salas

Leonardo Salas

HR Manager/Academic Advisor

Leoanrdo is our Human Resource Manager at AIU; at our institution...

Ikramul Hasan

Ikramul Hasan

Lecturer

Istanbul Technical University Doctor of Philosophy (PhD), Lithium Ion Battery...

Richard Solorzano

Richard Solorzano

Academic Advisor

Richard is an Academic Advisor at Atlantic International University. His...

David Marquina

David Marquina

Lecturer

Nutricionista y Magister Scientiae en Biologí­a Celular. Profesor de fisiologí­a...

Dr. Jose Vasconcelos

Dr. Jose Vasconcelos

Academic Advisor

Dr. Vasconcelos got his PhD in John Hopkins University. He has a very...

William Mora

William Mora

Academic Tutor

Nadia Gabaldon

Nadia Gabaldon

Academic Coordinator

Nadia is one of our Student Coordinators at AIU. She...

Tyler Gleckler

Tyler Gleckler

Lecturer

Hebrew University of Jerusalem Master of Science (MS) 2018-2021 The...

Dr. Silvia Restorff

Dr. Silvia Restorff

Academic Advisor

Silvia is one of our Academic Advisors at AIU. As...

Irena Travar

Irena Travar

Lecturer

Ph.D. in Geosciences (module Tourism). With more than 10 years...

Mohamed Ahmed

Mohamed Ahmed

Lecturer

a robotics software developer with experience in building reliable pipelines...

Dr. Francia Hernandez

Centro de Investigación en Alimentación y Desarrollo Doctor of Philosophy...

Dr. Ariadna Romero

Dr. Ariadna Romero

Advisor Coordinator

As an Academic Coordinator, Ariadna is an integral part of...

Mónica Fonseca

Mónica Fonseca

Lecturer

a Biology teacher, and I have a master’s degree in...

Hilda Londoño

Hilda Londoño

Lecturer

Con un recorrido de 23 años en el área de...

Heather White

Heather White

Lecturer

Nationally Certified School Psychologist with more than twelve years of...

Belen Silva

Belen Silva

Lecturer

Chemical Engineer (UBA). Carbon accounting, mitigation and offsetting for public...

Babatunde Olabode

Babatunde Olabode

Academic Advisor

Self-motivated, determined, hardworking and passionate person, who handles all responsibilities...

Robenson Jean

Robenson Jean

Lecturer

Universidad Nacional Autónoma de México Master of Engineering (MEng), Renewable...

Dr. Milton F. Marin Cedeño

Dr. Milton F. Marin Cedeño

Academic Advisor

Milton, is a very enthusiastic person that always delivers excellence...

Juan Bendeck

Juan Bendeck

Lecturer

University of California, Irvine Virtual Reality 2018-2018 Tecnologico de Monterrey...

Rachel N

Rachel N

Lecturer

English Teacher to Speakers of Other Languages

Raul Lopez

Raul Lopez

Lecturer

Ha trabajado en varias funciones para algunas empresas de Fortune...

Olga Camacho

Olga Camacho

Lecturer

Profesional con más de 24 años de experiencia en el...

Alejandra Rosas

Alejandra Rosas

Lecturer

Profesional de Recursos Humanos con más de 11 años de...

Arturo Romero

Arturo Romero

Academic Advisor

Universidad Nacional Autónoma de México. High School. Escuela Nacional Preparatoria...

Abdullah Mughees

Abdullah Mughees

Lecturer

I am doing a Ph.D. in Electrical Engineering from NUST,...

Vilma Chinchilla Valderrama

Petroleum Engineer | LaTeX | TikZ | Data Entry

Dr. Mohammad Shaidul

Dr. Mohammad Shaidul

Academic Advisor

Mohammad is one of our Academic Advisors at AIU. He...

Amiakhor Ejaeta

Amiakhor Ejaeta

Academic Tutor

To utilize my educational background, skill sets and professional experience...

Dr. Kanbiro Orkaido

Dr. Kanbiro Orkaido

Academic Advisor

At Atlantic International University (AIU), we are proud to highlight...

Syed Hassaan Ali

Syed Hassaan Ali

Lecturer

,I am very excited to branch into the world of...

Deborah Rodriguez

Deborah Rodriguez

Tutor Coordinator

Tutor Coordinator Deborah Rodriguez Objective Obtain a position in which...

Petar Stanic

Petar Stanic

Lecturer

Excel Wizard | Skilled Financial Analyst | Data Analysis Expert

Vedran Obućina

Vedran Obućina

Lecturer

Interdisciplinary social scientist and theologian

Leidulataja Jimenez

Preschool teacher, curriculum developer, and content creator in the field...

Antonio Berrio

Antonio Berrio

Lecturer

Diseñador arquitectónico de formación con un Máster en Diseño Arquitectónico....

Dr. Edward Lambert

Dr. Edward Lambert

Academic Director

 Edward is one of our Tutors at AIU. He is...

Nicolás Valderrama

¡Hola! Soy Nicolás Sáez, un profesor entusiasta de Física y...

Syed Qasim Shah

Syed Qasim Shah

Lecturer

Dedicated academician with over 10 years of experience in teaching,...

Magaly Masis

Magaly Masis

Lecturer

Universidad Libre de Costa Rica Bachelor’s degree, criminology Universidad de...

Ariela Schulman

Ariela Schulman

Lecturer

Universidad de Buenos Aires / UBA 2012-2012 Harvard University 2009-2009...

Christine Udarbe

Christine Udarbe

Academic Advisor

Christine’s mission as an Academic Advisor is to ensure the...

Dr. Ofelia Love

Dr. Ofelia Love

AIU Director

Dr. Ofelia Love is the Director at AIU. She has...

Lana Stamenkovic

Lana Stamenkovic

Lecturer

The Faculty of Organizational Sciencies 2009-2011 The Faculty of Philology...

Elif Kalayci

Elif Kalayci

Lecturer

Middle East Technical University (METU) Doctor of Philosophy (PhD), Science...

Nosha Assareh

Nosha Assareh

Lecturer

PhD,Data analyst,Programming, Statistical analyst

Cheila Ramirez Brens

Médico con trayectoria en la industria de outsourcing de productos...

Patricia Marin

Patricia Marin

Academic Assistant

Patricia Marin is an Academic Assistant at Atlantic International University...

Eka Bobokhidze

Eka Bobokhidze

Lecturer

University of Chester Master of Science (MS), Public Health Nutrition...

Rabia Liaquat

Rabia Liaquat

Lecturer

Rabia has 8 year of experience in Mathematics with expertise...

Dr. Adesida Oluwafemi

Dr. Adesida Oluwafemi

Academic Tutor

Academic and Professional Qualifications with Dates:   Unilorin Primary School  ...

Seth Thomas

Seth Thomas

Lecturer

Data Scientist & Visualisation Expert

Prof. Dr. Waqas Abrar

Dr. Abrar holds PhD in Business Analytics and Operations from...

Muzahir Ali

Muzahir Ali

Lecturer

I am a professional academic researcher, an academic writer, and...

Opoola Tobi Rotimi

Opoola Tobi Rotimi

Academic advisor

OBJECTIVE To pursue a distinct career, and contribution to the...

Scott Wilson

Scott Wilson

Academic Advisor

William Scott is one of our Academic Advisors at AIU. He...

Erika Cervantes

Erika Cervantes

Lecturer

Native Spanish (Mexican worked for 12 LATAM countries) with English...

Andrew Orme

Andrew Orme

Lecturer

13 years of experience creating 3D models and technical drawings...

Dr. Lucia Gorea

Dr. Lucia Gorea

Academic Advisor

  Dr. Lucia Gorea is an award-winning poet, widely published writer, literary...

Umar Hassan

Umar Hassan

Lecturer

HRM is my core area of expertise including all of...

Abdulqader Mohammed Alawi B

Greetings! I am a top-rated chemical engineer on Upwork, bringing...

Gino D’Alessio

Gino D’Alessio

Lecturer

Más de 20 años de experiencia como Trader/Broker en los...

Ronaldo Sosa Cortes

I am a Spanish Tutor with over a decade of...

Leticia Lorena Da Costa Leites

Salud y bienestar/Escritora profesional y creativa/ Blogs y articulos

Gonzalo U. Fernández

Profesor de cursos de pregrado y posgrado. Investigador en varios...

Sophia Petrou

Sophia Petrou

Lecturer

Graduate of Hellenic College Holy Cross in Brookline, MA, having...

Isabel Bujalance

Isabel Bujalance

Lecturer

la Societat Catalana de Terí pia Familiar Col·legiada níºm; 699 Bachelor’s...

Kristen Baker-Geczy

Experienced public relations specialist with nearly 15 years of industry...

Rosendo Huerta

Rosendo Huerta

Lecturer

Ingeniero Mecánico con más de 35 años de experiencia en...

Dr. Edgar Colon

Dr. Edgar Colon

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

  With excellent background in the sciences and medicine, Dr. Colon brings exquisite knowledge and insight into the world of Medicine, Radiology and Health Science. He has been honored with the Southwest Asia Service Medal, for his participation in the Persian Gulf War. Among others of his achievements, is his own published Dissertation work; Dr. Colon has contributed with research, in the area of kids with respiratory disease, implementing new perspectives to the field, and study of this area. At AIU, we are proud to have Faculty such as Dr. Edgar Colon, who bring so much input and dedication to our students.

           

Education/ Special Training:

2004      Atlantic International University, Hawaii, USA

           Doctor of Philosophy,

                        Major in Health Science “Summa Cum Laude”

                        School of Science and Engineering

1998      Medical Science Campus, University of Puerto Rico

           Master in Public Health,

                        Major in Epidemiology

            1992    Bachelor in Health Sciences,

                        Major in Health Services Administration

                        Medical Science Campus, University of Puerto Rico

            1989        Medical Science Campus, University of Puerto Rico

           Associate Degree in Radiologic Technology,

            1999        Medical Science Campus, University of Puerto Rico

           Certificate in Computed Tomography,

             2000    Certificate in Magnetic Resonance Imaging,

                        Medical Imaging Consultant, Inc.

Languages:

Spanish: Good writing / Good conversation /

English: Good writing / Good conversation /

Experience:

2005– Present     Atlantic International University

Honolulu, Hi

Academic Advisor

             07-2001- Present Caribbean Central University of Puerto Rico

            Bayamón, Puerto Rico

            Professor

             11/92 – Present  One Veterans Plaza

            US Veterans Administration Hospital

            San Juan, Puerto Rico

            Radiology Technologist

            07/2001 – Present   Caribbean Central University of Puerto Rico

           Bayamón, Puerto Rico

           Clinical Instructor and Evaluator

           Computed Tomography and Magnetic Resonance Imaging

           Certificates Students

            01/2000 – 05/2000 University of the East

            Radiology Technology Program

            Carolina, Puerto Rico

            07/1989 – 11/1992       Pediatric University Hospital

           PR Medical Center

           San Juan, Puerto Rico

           Radiology Technician

            03/1989 – 05/1991   201st. Evacuation Hospital PRANG

            Camp Santiago, Salinas, Puerto Rico

            Patient Administration Specialist

Awards and Publications:

             1992    Persian Gulf Veteran,

                         Southwest Asia Service Medal,

                         W/2 Bronze Stars

            Continuing Education Program Catalog

            Metropolitan University of Puerto Rico

            Dissertations: Appropriate Uses of Contrast Media in Radiology

                       Security Aspects Related with Magnetic Resonance

Research

            Risk Factors for Hospitalization in Infants with Respiratory

            Scinsital  Virus Infection, 1999

            Aeroallergen Evaluation in Homes of Asthmatic Children in

            PR, 2000 Investigator,  Dr. José R. Rodríguez Santana, MD, FAAP

 Other qualifications:

Speaker

             Metropolitan University of Puerto Rico          

             Continuing Education Program

             Conferences: Basic Principles of Computed Tomography

                                  Basic Principles of Magnetic Resonance

                                  Appropriate Uses of Diagnostic Clinic Imaging

              Medical Science Campus, University of Puerto Rico

              Continuing Education Program

              Health Allied Professions

              Conference: Appropriate Uses of X-rays, Computed Tomograph

              and Magnetic Resonance Imaging

Collaborator

               Radiologic Technology Program

               Medical Science Campus, University of Puerto Rico

               Curriculums Designer for the Diagnostic Images Bachelor Degree

               Proposal

              Radiologic Technology Program

              Caribbean Central University of Puerto Rico

              Consultant for the Computed Tomography and Magnetic

              Resonance Certificates

              Consultant for the Diagnostic Images Bachelor Degree Proposal

              Commonwealth of Puerto Rico

              Puerto Rico Council of Higher Education

              Consultant for the Bachelor in Health Sciences with a

              Concentration in Computed Tomography and Magnetic

              Resonance Imaging, Interamerican University of Puerto Rico,

              Ponce PR

Lynet Davidson

Lynet Davidson

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

An experienced lawyer with a strong analytical mindset and passion for helping businesses succeed

Manuel A Patino

Manuel A Patino

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Psicólogo y profesor de yoga certificado con estudios en psiconeuroinmunologí­a (PNI) y aplicaciones terapéuticas de la meditación. Usuario profesional de tecnologí­as de biorretroalimentación para terapias holí­sticas (¿Conoces HeartMath?) y los fundamentos de Ayurveda y T. Medicina China.

Tobias Roberts

Tobias Roberts

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Universidad Evangélica Nicaragüense Martin Luther King Master of Arts (MA), Community Development 2014-2017 Western Kentucky University Bachelor of Arts (BA), History 2003-2006

Niavo Landihajaina Ratsimbazafy

Niavo Landihajaina Ratsimbazafy

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

English Teaching Program Antananarivo (ETP) English- Level Advanced (Score TELP B2 Level) Cadre européen de références pour les Langues Other, Français (DALF C2) 2014-2014 Ecole Supérieure des Sciences Agronomiques Engineer’s degree, Engineering sciences, Agronomic and Environmental sciences 2011-2016

Albina Mehmeti

Albina Mehmeti

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

As an architect of 2 years experience in a local studio, I gained the ability to intertwine with clients’ ideas. I can manage to “translate” your ideas into plans, visualization which are the first steps into designing and transforming your space. My 3d rendering is my main point, as well as planning and urban design. Just imagine and your ideas can become real.

Cyndy Dominguez

Cyndy Dominguez

Position: Academic Tutor
Phone: 1808 892 3472
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

I want to be part of the success in an environment where I can use my talents and skills and to grow and expand the company and also learn new skills and grow within the company.
Experience
SAS retail Merchandising 07/2004 – 05/2010
I was a team Leader for a reset team of six members that would go to different supermarket chains to set up new locations for upcoming new items and to remove the discontinue items. I worked in the remodel team, and I did special projects.
AIU Tutor 08/2011 – 05/2012
My Job was to help students with their Phase 1 and Phase 2 of the program, I would call, email, and Skype with them to make sure they would stay active with the program. If they had any difficulties understanding the first two phases I would direct them so they would not quit the program and continue with their education. I would also remind them of their upcoming payments or if a payment was late.
McColgan Family 04/2013 – 12/2015
I was a tutor for two children ages 5 and 3 in Spanish
AIU Academic Tutor 05/2017 – Present
Supervising my Admissions Counselors are efficient with their time and results. Motivating and Educating our Admissions Counselor in our programs. Being first Academic Contact for our students and giving them the road map of what to expect in their program. Following up with students throughout their program to ensure they stay active academically and financially. Supervising my co-tutor and delegate activities, I need assistance with.
Education
High School Diploma Reseda High School 9/1999 – 6/2003
Associates in Criminal Justice El Camino College 9/2003 – 06/2004
B.A. in Marketing Atlantic International University Present
Skills
Bilingual, I speak, read, and write English and Spanish. Good Communication skills, positive attitude, team player, self-confidence, strong work ethic, time management abilities.

Bairbre Hassett

Bairbre Hassett

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

University of Limerick Master of Arts (MA), Sport Psychology 2017-2018 Waterford Institute of Technology Bachelor of Arts (BA) 1997-2001

Bahadir Bozoglan

Bahadir Bozoglan

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Ph.D. in Psychological Counseling and Guidance, Senior Academic Researcher, Reviewer, Psychotherapist, and Supervisor of Systemic Approach, with international supervision training from IF Weinheim: Systemische Ausbildungen Institute.

Jay Bachahally Radhakrishnan Vijayasimha

Jay Bachahally Radhakrishnan Vijayasimha

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Top Rated (official Upwork badge) full-time freelancer and I focus on tutoring. I provide weekly, monthly, and semester-long mentoring for students from all over the world.

Dr. Olga C. Fontes

Dr. Olga C. Fontes

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

 Olga is an Academic Advisor at AIU. She is a very hard worker, and she always gives her best. These qualities make her the perfect fit for our students, because her passion is to help the students in following their dream of continuing an education. We are very proud to have Olga as part of our team of advisors.

Education/ Special Training:

            Atlantic International University

Honolulu, HI

Bachelor of Business Administration

            University of Maryland

College Park, MD

Undergraduate Studies

o   GFEBS L453E Purchase Orders and Contracts, November 2011

o   Army Readiness Assessment Program, October 2011

o   Annual DoD Information Assurance Awareness Exam, May 2011

o   GFEBS L250E Acquisition Process Overview, January 2011

o   GFEBS L251E Accounts Payable Process Overview, January 2011

o   GFEBS L483 Order Execution, January 2011

o   GFEBS L281E Project Systems Process Overview, January 2011

o   GFEBS L482E Creating and Processing Work Notifications, January 2011

o   GFEBS L280E Plant Maintenance Process Overview, January 2011

o   GFEBS L454E Goods Receipt Processing, January 2011

o   GFEBS L452E Purchase Requisitioning and Approval Workflow, January 2011

o   Awareness Training, October 2010

o   GFEBS L101E GFEBS Overview, November 2010

o   GFEBS L303E Navigation and Reports, December 2010

o   GFEBS L201E Integrated Process Overview, December 2010

o   DoD Information Assurance Awareness, May 2010

o   WAWF – Wide Area Workflow, February 2010

o   DoD Information Assurance Awareness, April 2009

o   WNSF – Portable Electronic Devices and Removable Storage Media, April 2009

o   WNSF – Safe Home Computing Course, April 2009

o   WNSF – Personally Identifiable Information (PII) course, April 2009

o   PRWeb Acquiline, January 2009

o   Annual Refresher PII Training, January 2009

o   Operation Excellence Front Line Employees Program Course, November 2008

o   Computer User Test, May 2008

o   DoD Awareness Assurance Awareness, April 2008

o   Information Assurance Refresher Training, July 2007

Languages:

English: Good Writing/ Good Conversation

French: Good Writing / Good Conversation

German: Good Writing / Good Conversation

Portuguese: Good Writing / Good Conversation

Spanish: Good Writing / Good Conversation

Work/Volunteer Experience:

2004-Present

Atlantic International University

Honolulu, Hi

            Academic Advisor

       U.S. Army

USA

Ordering Officer

       USAG

Ansbach, Germany

Family Housing Quarters Inspector

 USAG

Ansbach, Germany

Sports Assistant and Customer Service

 USAG

Ansbach, Germany

Child Care Educator

Airport Funchal

       Madeira, Portugal

Customer Service Assistant

       Antonio Clemente,  Lda.

Funchal, Madeira

Accountant & Bookeeper

Dr. Prakash Menon

Dr. Prakash Menon

Position: Academic Advisor
Phone: 1800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Over twenty years of diverse supply chain, business systems and processes, and technical/engineering experience coupled with graduate engineering and business education. Emphasis in recent years on project management with emphasis on supplier development and logistics. Proven success at exceeding business goals by leveraging technology, process realignment, vendor management, and cost optimization. Experienced in business process reengineering and managing operational and organizational change using six sigma techniques. Initial five years of career spent in operations management in the petroleum industry on offshore oil drilling rigs.

PROFESSIONAL EXPERIENCE

John Deere                                                                                                             1999-Present

Twenty-four billion dollar global leader in the manufacture of farm equipment, industrial, forestry, and lawn-care equipment.

 

Divisional Process Leader, Commercial & Consumer Division, Cary, NC.   2005 – Present 

  • Manage multiple projects integrating suppliers and logistics operations for the division.
  • Responsible for cost savings of over $2 million annually by optimizing supply networks and export consignments.
  • Monitor product delivery metrics to the dealer and mass channel (Lowes & Home Depot).
  • Managing “achieving excellence” initiatives and fulfillment metrics with the supply base.
  • Lead diverse teams to integrate enterprise and divisional initiatives through regular community of practice meetings.

 

Project Manager – Integration, Worldwide Supply Chain Management, Moline, IL. 2003 – 2005 

  • Full cycle development and implementation of Logistics operations for Global factories and cross-dock facilities.  Lead the project that included data modeling, system architecture, configuration, and analysis of business requirements.
  • Established the linkage between information technology operating priorities and business unit strategy.
  • In addition, led a team of five professionals and several developers in coordinating integration with SAP and Legacy Order Entry systems and for developing reporting systems using Business Objects.

 

Project Leader – Planning & Integration, John Deere Supply Net, Moline, Illinois.  2000 – 2003

  •    Led design, development, and application integration for Supplier Network.  The JD Supply Net was an e-business initiative to provide suppliers with a web based front end for order entry, order tracking.  This tool was linked to inbound transportation network to optimize continuous moves of complete goods, parts, and accessories.

 

 

Project Lead – Demand Collaborate Project, Consumer Products, Charlotte, NC.   1999 – 2000

  •    Managed a consumer products team through the installation and implementation of the Manugistics Networks Collaborate, a web-based tool applying market intelligence and providing demand forecasts.
  •    By deploying a collaborative forecasting solution, the project enabled customer-level forecasting, increased forecast accuracy 60%, removed 5 cycle days from process, and reduced staffing requirements by 50%.

 

Initial Positions as: Team Leader – Enablement, Order Fulfillment Team, Consumer Products, Charlotte, NC and Project Lead – Technical, Demand Management Project, Commercial & Consumer Equip. Div., Raleigh, NC

North Carolina Department of Environment                                                                             1993-99

Regional Engineer — Managed air quality regulations and monitored emissions inventory for various industrial sectors in North Carolina. Worked with United States Environmental Protection Agency (USEPA) as a panel member of the national pharmaceutical team in forming regulatory compliance stipulations for the pharma industry.  Coordinated the use of USEPA Screen and ISCST Models and generate reports to analyze the effects of industrial pollutant dispersion.

 

Oil & Natural Gas Corporation (ONGC), Mumbai, India.                                                                   1984-89

Planning & Logistics Engineer (1987 – 1989)

Team member of oil well planning and material logistics team.   Provided planning and material allotment for transportation to offshore sites from base locations.  Provided material specifications, recommendations and global tender evaluation for oil field equipment purchases.  As a Materials Engineer was member of the global material procurement team, which recommended purchase initiatives and promoted supplier diversity.

     

Executive Production Engineer (1984 – 1987)

Worked on offshore oilrigs as a production engineer.   Was involved with operations and oil well reservoir study and well completions.  Lead a team of six professionals and ten staff members in completions, testing of high-pressure gas wells, and recommending remedial methods for production enhancement.  Worked on high-pressure oil/gas wells in Indonesia as part of an extended training program conducted by Schlumberger. Collaborated with Halliburton on coiled tube cementing processes during work-over operations to stimulate oil wells.

PROFESSIONAL AFFILIATIONS

Member – Project Management Institute

Member – Academy of Management

Panel Member – Supply Chain Collaboration, Manufacturing Business Conference, Kellogg School of Business, Northwestern University, 2002

Member – Council of Supply Chain Management Professionals

Asha Smith

Asha Smith

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Georgia State University Master of Arts (MA), Applied Linguistics 2020-2023 Georgia State University Bachelor of Arts (BA), Applied Linguistics 2014-2019

Ángela-Jo Touza-Medina

Ángela-Jo Touza-Medina

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Global Nonprofit & Social Impact Consultant | HR & Talent Acquisition

Jose Manuel Juanas

Jose Manuel Juanas

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Universitat Pompeu Fabra Master’s degree, Compulsory Secondary Education 2015-2016 Universitat Oberta de Catalunya Bachelor of Laws (LLB), Bachelor of Labor Sciences 2009-2011 Universitat Oberta de Catalunya Master’s degree, Law 2008-2015 Universitat Ramon Llull Foundation degree, University Diploma in Labor Relations 1997-2000

Bojana Ristic

Bojana Ristic

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Basque Center on Cognition, Brain and Language & University of the Basque Country Doctor of Philosophy (PhD), Linguistics Basque Center on Cognition, Brain and Language & University of the Basque Country Master of Science (MS), Neurocognitive Science of Language University of Novi Sad Bachelor of Arts (BA), English language and literature

Antreas Naziris

Antreas Naziris

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

a Phd graduate in Electrical and Electronic Engineering. My spectrum of experience is shown in the following bullet points: • Electronic circuit simulation software especially in o AC-DC converters o DC-DC converters • Matlab Simulink • Experience teaching in Electrical, Electronic and Computer Engineering courses (University level) • Electrical vehicle charging and chargers • Energy storage

Pilar Cepeda

Pilar Cepeda

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Spanish | Project Manager | Customer Service | 8+ Exp.

Nick Karim

Nick Karim

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

    Dr. Karim has been in the Field of Education for many years.  He is currently at our Faculty as an Academic Advisor, and he is the Dean of the Academic Department at ITT. His passion to teach, and make a difference in the life of his students, has made Dr. Karim, able to continue with his mission of facilitating education, to the generations to come.

 

Education/ Special Training:

            Youngstown State University

            Youngstown, Ohio

            M.S.E.E, Electrical Engineering

Cleveland State University

Cleveland, Ohio

B.S.E.E, Electrical Engineering

Minor in Math and Computer Science

Languages:

            English: Good writing / Good conversation

Experience:

            2001-Present   ITT Technical Institute

            Academic Affairs Department

            Youngstown, Ohio

            Dean

            1998-2001:      ITT Technical Institute

            School of Information Technology

            Youngstown, Ohio

            Chair and Professor

            1994-1998:      ITT Technical Institute

School of Electronics

Youngstown, Ohio

Chair and Professor

1985-1988:      Cuyahoga Community College

College of Science & Technology

Cleveland, Ohio

Instructor

            1988-1991:      Insurance Automation Systems,

            Home and Commercial Insurance Rating Software Development Division

            Cleveland, Ohio

            Systems Analyst/Programmer

            1987-1988:      ETI Technical College

Cleveland, Ohio

Instructor

 Awards and Research:

   2004 ITT Technical Institute

Dean of the Year based on achieving the best attrition percentage

National Level

1998, 1999 ITT Technical Institute

 School Chair of the Year

District level

1999   ITT Technical Institute

School Chair of the Year

National level,

                        1881-83, 1991-94 ITT Technical Institute

Dean’s List five times during undergraduate and graduate studies

Diana Ugalde

Diana Ugalde

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

I am a research engineer with a background in Food Science, Agriculture, Nutrition and, Sustainability. I have managed several research projects in these areas during which I have used quantitative and qualitative research methods to analyze results and write meaningful reports. I have completed a Ph.D. and therefore, I have developed skills to search for the right information and sources, synthesize this information and write accurate content.

Juan Pablo Sanchez Lorenzo

Juan Pablo Sanchez Lorenzo

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

IT Manager | Cybersecurity Analyst | Programmer

Safet Mutapcija

Safet Mutapcija

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

MEng in geotechnical engineering and BEng in engineering geology Experience with engineering geology/hydrogeology and geotechnical design and software like AutoCad, ArcGIS, GeoStudio, Modflow, Surfer, Golden strater, Golden Grapher, Photoshop, Adobe Illustrator, inDesign, Dynamic Probing, LogPlot, etc.

Maria Jaramillo

Maria Jaramillo

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Universidad de La Rioja Bachelor of Education (BEd), CLIL Metodology 2020-2021 Universidad de La Sabana Bachelor of Education (BEd), Early Childhood Education 2012-2017

Muhammad Usama Jamil

Muhammad Usama Jamil

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

llama Iqbal Medical College Lahore, Pakistan Bachelor of Medicine, Bachelor of Surgery (MBBS)

Sergen Bayram

Sergen Bayram

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Ondokuz Mayis Üniversitesi Bachelor of Business Administration (BBA), Business 2011-2016

Carmen Solórzano

Carmen Solórzano

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

a University professor and chair in sustainable rural development and agroecology. I am an agronomic engineer, holding a Master’s degree in Planning Regional Development, and a Ph.D. in Management.

Abdulkadir Dogan

Abdulkadir Dogan

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Ph.D. Economist mainly specialized in macroeconomics, financial market, data analysis and risk management.

Rebecca Taylor

Rebecca Taylor

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

I am a Registered Nutritionist with a BSc in Nutrition and MSc in Personalised Nutrition. With a strong background in nutrition and a passion for writing and Nutrition communication, I have developed the skills necessary to create engaging, informative, and accurate content that resonates with audiences.

Luis Aliaga

Luis Aliaga

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

a highly experienced engineer focused in the renewable energy area, having worked for more than 8 years in different hydroelectric, wind and solar plants, and in different stages of projects such as studies, construction, operation and maintenance

Dr. Randall Raus

Dr. Randall Raus

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Randall is an Academic Advisor at AIU. He is a very hard worker, and always gives the best of himself. These qualities make him the perfect fit for our students, because his passion is to help the students to follow their dream of continuing an education. We are very proud to have Randall as part of our team of advisors.

Education/Special Training

            2009 Atlantic International University

Ph.D. Computer Engineering

            California State University at Long Beach (CSULB)

1993 – Masters Computer Engineering

            1985 – Bachelors Computer Science & Engineering

            1970 – Bachelors Mathematics

Languages:

            English: Good Writing / Good Conversation

 

Experience:

            2009- Present Atlantic International University

Academic Advisor

1996-2009
Freelance Technical Editor/Writer

            Computer Consultant

1985-1996
Telecommunications Engineer – VoCal Telecommunications

1975-1982
Statistician – City of Detroit

Published Books (Research & Education Association):

 

            2002 – The Best Test Preparation for the Engineer in Training Exam

            2001 – Super Review of Computer Networks

            2000 – Java Super Review

            1998 – Essentials of Computer Science II

            1997 – Essentials of Computer Science I

Silvana Mici

Silvana Mici

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

counseling psychologist graduated in Msc Counseling Psychology and Pedagogy”

Miriam James

Miriam James

Position: Academic Tutor
Phone: 1-808-3776381
Email: [email protected]
Categories: Academy, Admissions, AIU Staff

OBJECTIVES:
To obtain more knowledge and become a role model to others in the work environment. Share
what I have learnt to my colleagues, which will better our work environment to develop the
company for the future.

EDUCATION:
Primary Education – Desruisseaux Combined School
2001-2006 – Micoud Secondary School
2008 – Sir Arthur Lewis Community College (Certificate)
Sir Arthur Lewis Certificate

JOB EXPERIENCES:
January 2017 to Now
Atlantic International University, Admissions Counselor

March 2006 to May 2006.
Sagicor Life Inc., Receptionist

August 2006 to November 2010.
Bri Properties Ltd., Secretary

December 2010 to January 2012.
I&C Insurance Brokers Ltd, Administrative Assistant

February 2012 to 21st September 2015.
Bri Properties Ltd., Secretary

September 2016 to November 2016.
Caribbean HOTFM, Sales Executive

Dr. Darian Schiffman

Dr. Darian Schiffman

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Silvia is one of our Academic Advisors at AIU. As an alumni she knows firsthand how our programs works and has the ability to help our students succeed in achieving their goals. She is a great fit to our academic team and we are proud to have her.

 

Education/ Special Training:

 

 

            Atlantic International University
Doctorate in Political Science

 

Atlantic International University
Master in Political Science

Atlantic International University
Bachelor in Political Science

 

Certificate in Strategic Planning- Attorney College of Guatemala
 Seminar in “National Security Planning Workshop- NSPW”-
National Defense University Studies, in Washington, D.C.

Seminar in “Evaluation of Strategic Security Plan Objectives of the Nation”
National Defense University, Washington, D.C

Political Defense and Strategy Course
National Defense University, Washington, D.C

 Seminar in “Progress of the National Security System”
National Defense University, Washington, D.C

Certificate in National Security Systerm Functions

 

Languages:

 

Italian: Good Writing/ Good Conversation
Spanish: Good Writing/ Good Conversation

 

 

Work/Volunteer Experience:

 

2004-Present

Atlantic International University
Honolulu, HI

Academic Advisor

 

Centurion Security
Consultant and Marketing Manager

Advisor of the Planning Advisory Commission and the National Security Council

National Defense University
Vice-president of the Alumni Association

      

National Defense University
Investigative Assistant in Security


       INEES
Subdirector to the International Corporation and Academic Development

 

INAP
Professional Advisor

Educational Ministry in Germany
Public Worker

TRANSFAIR Products
      Spinnrad Employee

Universidad Popular of Stuttgart, Germany
Spanish Professor

       Universidad Popular of Friedberg, Germany
       Spanish Professor

Rene Cordon

Rene Cordon

Position: Academic Advisor
Phone: 1 808 215 0431
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

P R O F E S S I O N A L  S U M M A R Y

Responsible and dedicated to any job, always looking forward to learn and improve for the companies’ good, earning the trustworthiness of the owners in the jobs I have been therefore been promoted in different companies worked.

E X P E R I E N C E

Atlantic International University – Honolulu, HI

· November 2015 – Current

Academic Advisor

I’m responsible of grading student’s assignments, guide them to stay active in their program and make sure all inquiries are responded effectively.

Allied Global – Guatemala

Technical Assistant – Time Warner Cable

From 2013 until 2015

INTERPRETATION SERVICES

-English/ Spanish Interpreter for 18 months

-New Talk – Phone Services – Houston Texas

Sales Representative 2011 – 2013

E D U C A T I O N

January 2024

MBA – Institutional Management

Atlantic International University – Honolulu, HI

Current

October 2019

Bachelor’s Degree in Education with Major in Teaching English as a Second Language.

Atlantic International University – Honolulu, HI

October 2002

High School Diploma – Computer Science Oriented in Commerce Colegio Evangélico ELIIM Zacapa, Guatemal

Muhammad Saghir

Muhammad Saghir

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

University of Balochistan Quetta Pakistan Master of Commerce (MCom), Commerce and Management 1977-1979 University of Balochistan Master of Arts (MA), Political science 1974-1976

Pablo Mora

Pablo Mora

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Desarrollador certificado por AWS y de aplicaciones de Kubernetes con experiencia en el campo de TI desarrollando aplicaciones para empresas como IBM y Kyndryl. Especializado en DevOps.

Dr. Nilani Ljunggren

Dr. Nilani Ljunggren

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Nilani Ljunggren De Silva, PhD

Researcher

 

EDUCATION:           Ph.D. in Human & Social Science, Atlantic International University, USA (2008)

MA in International Pedagogy Stockholm University

MA in Mass Communication, Leicester University, UK

Sociology Bachelor and Magister, Stockholm University

SPECIALIZATIONS: DevelopmentEducation, Post Conflict Studies, Women studies, Gender, Decentralisation, Globalisation, Migration, Governance, Democracy, Human Right framework to analyse Education, Diversity and teacher education, Inclusive education, Civil Society & Social and cultural Capital.

 

Computer skills:         Microsoft Office (Word, Excel, PowerPoint), Outlook,

and familiar with Microsoft Project.

PUBLICATIONS:

Books:

2005            Documentary Novel: Monsoon Dream/

Woman’s battle in Conflicts: (Book Surge Publishing USA

2nd edition: Vijitha Yapa Publishing, Sri Lanka

2008                             Abuse of Immigrant Brides: How to tackle the Problem?

                   (Publisher: Stockholm University)

Work in progress          Comparative Study: Girls Education in Post Conflict:

                   Sierra Leone & Liberia- PhD Thesis (Atlantic International

                   University Publication, USA)

                                            Female Voices from the Battle Field in Liberia

                                            Ethnographic Field work-composing as poetries

Articles                                Flickors kamp för utbildning I Liberia

                                            Education in Post Conflict countires-African Affairs –Focus Africa published in May 2009.

Papers

Present at               Södertörns University- Stockholm

International           Nordic Seminar on Social Movements

Conferences:         “Women Migration & Social Mobility”

 

                    Nordic African Institute- Uppsala

“Female Circumcision & Polygamy: Young women

Challenges culture in Post war transition: Liberia & Sierra

Leone”

                   Nordic Africa Institute –Denmark

                   “Millennium Development Goals

                   Challenges & Possibilities”

                   SIDA- Global Challenge in Research Corporation

         “A Gender Framework for Education Policy Dialogues:

Women, Education & Development

Lectures:                     Feminist analysis on Field of Gender, Development & Education: Institute of International Education

University of Stockholm

 

Work Experiences:

2008-2009       Researcher, Stockholm University

2008-2009                          Open University Sri Lanka, Visiting Lecturer & Course designer masters level in sociology

2008                Scholarship holder programme Office

SIDA, Sweden

2008                            Guest Researcher at Nanjala

                                   University, Sierra Leone (June-Aug)

2008-10-16                  Scholarship Holder, Nordic African University

                   (September-October, 2008)

2004-2008                          Link Publishing, Book Reviewer and Publishing Coordinator (parallel with PhD programme)

2001-2002                          Worked as an Administrator at Botswana Embassy.

1995-2000                          Worked as a Media Researcher in the Columbus Publishing Company- publishing House, in London, UK.

1990- 1995                         Work as a Press and Public Relation Officer at Sri Lanka Embassy in Stockholm- Liaison with various relevant NGOs and developed assistant organisation: SIDA, DANIDA and FINNIDIA.

1986-1989               Worked as a Project Assistant at USAID in Sri Lanka-US Embassy, mainly dealt with development projects funded by USA in rural areas in Sri Lanka.

Voluntary work:                 Work as a voluntary for the Red Cross (prison visits) in Sweden followed two Red Cross voluntary courses.

                                           

                                            Work with women shelter movement in Stockholm

Daniela Carrillo

Daniela Carrillo

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Su pasión por la educación y el trabajo con niños le ha llevado a trabajar centros de estimulación temprana y terapias con niños con trastornos del neurodesarrollo y dificultad en el aprendizaje, además de centros de educación regular, donde desempeña un trabajo clí­nico, educativo.

Liz Angie Paredes

Liz Angie Paredes

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Facebook Ads Media Manager | Digital Marketing | Lead Generation

Garett Reid

Garett Reid

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Sports and Fitness Writer.

Arhely Espinoza

Arhely Espinoza

Position: Academic Tutor
Phone: 1800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

  Arhely Espinoza is a Tutor at Atlantic International University. She is a very detail oriented person, as well as organized. She has explored many Fields throughout her academic and professional life; which gives her, a composite understanding  about the world and the people that inhabit it.  She is a great team member, and is always, willing to give the best of her knowledge about the Institution to the incoming students, to help them make the right decisions.

Education/ Special Training:

            2005-Present Morelos Autonomous University

            Morelos, Mexico

            Major: Psychology

            2003-2004 Ishtar Cultural Centers

            Morelos, Mexico

            Theatre workshop

            1998-2001 Department of Public Education

            Morelos, Mexico

            High School

            1995-1997 Alejandro Fleming Institute

            Mexico city, Mexico

            Tourism

Languages:

            English: Medium writing / Medium conversation /

            Spanish: Good writing / Good conversation /

Work/Volunteer Experience:

2004-Present

2001-2005 “Fotografiarte”

Morelos, Mexico

Photograph and Video assistant

Mark Alfons

Mark Alfons

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Mark Alfons has a vast expertise in: 1. Anxiety, Bipolar, and Schizophrenic disorders. 2. Psychological assessments. 3. Depression, Cognitive-behavioral therapy (CBT), and Dialectical Behavior Therapy (DBT). 4. Suicide, self-harm, and personality disorder. 5. Child and Adolescent Psychology. 6. Mental health services and US legislations. 7. Substance abuse, and eating, sleeping, and sexual disorders.

Syeda Batool Zaidi

Syeda Batool Zaidi

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Certified Professional Resume Writer | HR | LinkedIn Branding

Daniel Fernando Rozo Oviedo

Daniel Fernando Rozo Oviedo

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Acerca de Daniel Fernando Rozo Oviedo: B.S.c Fí­sico M.S.c Ingeniero Quí­mico | compensación Fí­sica, Mecánica de Fluidos – Profesional investigador con maestrí­a en Ingenierí­a Quí­mica y licenciatura en Fí­sica pura. – Con una amplia experiencia en programación y simulación de dinámica de fluidos computacional y matemáticas y fí­sica avanzadas. – Con interés académico en el modelado y desarrollo teórico de la mecánica de fluidos y la mecánica relativista, y la teorí­a de la gravitación.

Sumaiya Parveen

Sumaiya Parveen

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

An expert accountant and statistics tutor with 3+ years of successful experience, providing quality services on budget and time.

Muhammad Al Fayshal Shiraj

Muhammad Al Fayshal Shiraj

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Mechanical Designer in various machinery industries. Graduated from a top 20 Australian university with 5 years of machine design experience. Has an end-to-end knowledge of product development and research.

Dr. Andreas Rissler

Dr. Andreas Rissler

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Andreas is one of our Academic Advisors and Admission Counselors at AIU. He has a highly impressive record of accomplishment in various business aspects pertaining to economics and psychology. He has extensive business experience throughout Europe and South Africa. Andreas is an independent, driven, results oriented person who combines creativity with the ability to easily absorb detailed information in order to make effective decisions.

Education/Special Training:

KSUCTA– Kyrgyz State University of Construction, Transport and Architecture n.a. N. Isanov
Bishkek, Kirgizstan
Professor Dr. oec. of Business Science
 INSTITUTE OF ECONOMICS AND MANAGEMENT
Faculty Member

KSUCTA – Kyrgyz State University of Construction, Transport and Architecture n.a. N. Isanov
Dr. h.c. in Psychology

Languages:

English:    Good Writing / Good Conversation
German:   Native
French:     Basic
Afrikaans: Good Writing / Good Conversation
Russian:    Basic

Work/Volunteer Experience:

AIU – Atlantic International University
Honolulu, HI
Professor & Academic Advisor & Admissions Counselor
Faculty Member – School of Business & Economics

KSUCTA – Kyrgyz State University of Construction, Transport and Architecture n.a. N. Isanov
Bishkek, Kirgizstan
Professor of Business Science, Faculty Member – Institute of Economics and Management

IIBA – International Institute for Behaviour Analysis South Africa 
Managing Director and Founder

MDA – Mind Development Academy
Representation of AIU
Representation of IBS

Campus Institut AG München (Oberhaching)
Lecturer of Private and Social Security

University of Applied Sciences – Fach-Hochschule Schmalkalden
Lecturer / Examiner of Certified Financial Planner Programs

Bonner Akademie – Zurich Insurance Group
Senior Lecturer, Examiner and Seminar Leader

Achievements:

  • Invented and Developed the Personality Assessment system Personality-ABC and BehaviourProfiler
  • Honored with a Dr. h.c. in Psychology from KSUCTA for his research of Personality-ABC
  • Published Book and articles, videos about Personality-ABC
  •         Published Book in Germany – “Shares or Properties? Securities and Risks for the Investor”
Dr. Freddy Frejus

Dr. Freddy Frejus

Position: Academic Advisor
Phone: 1808 377 6386
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Dr. Freddy Frejus – academic  advisor at AIU

 Freddy Frejus is an  academic  advisor at AIU. he has demonstrated throughout his professional career that he is a goal oriented person, always focus on excellence. We are very proud to have such a hard working and efficient person,  our students are always satisfied with the help and assistance provided by him

Qualification : Doctorate in International Legal studies

Carlos Eduardo Hutchings

Carlos Eduardo Hutchings

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

As a mathematics tutor with more than 7 years of experience, I have worked with students of all levels from elementary to college. My expertise also extends to preparing students for college entry exams such as the SAT, ACT, GED, and CHSPE. I am confident that I can provide top-notch tutoring services online using my vast experience in teaching mathematics. I understand that the online learning environment can be challenging, but I am prepared to help students reach their highest potential. My setup for online tutoring is second to none; I have a high-speed internet connection, a secondary internet source, and a secondary power system in case of any failure. All these features ensure reliable and uninterrupted service at all times. What makes me stand out from the competition is my approach to personalized teaching. I tailor my instruction to each student’s unique needs and abilities, ensuring that they have a comprehensive understanding of the subject material. My methodical and patient style engages them in learning math concepts more effectively than traditional methods. I am confident that I can help you excel in mathematics. With my knowledge and experience, I can provide a comprehensive online tutoring service to ensure you achieve the best results possible. To better serve my students, I am also proficient in teaching other topics such as statistics, chemistry, physics, science, Spanish, and English. In addition to providing instruction through online platforms, I can also guide the development of study skills that will help maximize success in the classroom. If you are looking for a math tutor who offers personalized instruction and an understanding of college entry exams – I am the best choice for the job. Feel free to contact me if you have any further questions.

Shafaqat Siddique

Shafaqat Siddique

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

IT Specialist (DEV OPS) Team Lead, Information Security Researcher, Malware Analysis, Ethical Hacking, ASP.NET Csharp

Faith Caube

Faith Caube

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

University of the Philippines Manila Bachelor of Science (BS), Occupational Therapy University of the Philippines Manila Master of Science (MS), Medical Anthropology 2014-2023

Dirk Witte

Dirk Witte

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Dirk Witte Permaculture design, foraging, herbal-ism and food security. Permaculture design, integrated and layer landscape sustainable agricultural designs and practices. Urban farming, aquaponics, sustainable gardening, foraging wild edibles and professional herbalism. I also have more than 25 years in food security.

Muhammad Waleed

Muhammad Waleed

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Accounting Tutor | Economics Tutor | Managerial Accounting Tutor

Dr. Omer Farooq Khan

Dr. Omer Farooq Khan

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

a Doctor with clinical experience in Child healthcare & I also worked as a General Medical practitioner and Paediatric Nutritional expert for two years successfully in remote areas of my country. currently working as resident of Surgery in one of the leading hospitals of Rawalpindi Islamabad region.

Victor Marin

Victor Marin

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

SR. Rsch. | Acad. & Tech. Writ. | B.Sc. Psych. | M.Sc. Ed & HD

Leonardo Salas

Leonardo Salas

Position: HR Manager/Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Leoanrdo is our Human Resource Manager at AIU; at our institution he develops his skills, working with our inacoordinators and training all personnel to ensure AIU is highly represented. He is a team player, and is always ready to learn new skills that will contribute to her growth.

Ikramul Hasan

Ikramul Hasan

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Istanbul Technical University Doctor of Philosophy (PhD), Lithium Ion Battery and Nanotechnology 2018-2022 Istanbul Technical University Master of Science (MS), Electrical engineering 2016-2018 Islamic University of Technology Bachelor of Applied Science (BASc), Electronic engineering 2011-2014

Richard Solorzano

Richard Solorzano

Position: Academic Advisor
Phone: 1800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Richard is an Academic Advisor at Atlantic International University. His area of expertise lies within Management, Management Information Systems, and Graphic Technology. His experience in life is very outstanding, and he is always looking for new ways to give back to his surroundings, as well as to his students. We are very proud to have Richard in our Satff and Faculty, for he has many qualities to offer to our students.

Education/ Special Training:

2012 Air University
Montgomery, AL
Master of Military Operational Art and Science in Joint Warfare

2006 Northcentral University                            

Prescott, AZ

Dual M.B.A., Management Information Systems and Management

2001 Webster University

St. Louis, MO

Dual M.A., Computer Resources & Information Management and Management

1999 Wayland Baptist University          

Plainview, TX

B.S., Occupational Education with emphasis in Graphic Technology

1998 Community College of the Air Force                                                                           

Maxwell AFB, AL

A.A.S., Audiovisual Production Services

Languages:

            Spanish: Good writing / Good conversation /

            English: Good writing / Good conversation /

Work/Volunteer Experience:

Present Atlantic International University

Honolulu, Hi

Academic Advisor

 

2007 – Present Air Force Recruiting Service

Randolph AFB TX

Chief, Advertising,

 

2004-2007 341st Recruiting Squadron   

Lackland AFB TX 

Support Flight Commander

2003 – 2004 Plans and Implementation Flight

Holloman AFB NM

Officer in Charge

2002-2003 49th Mission Support Group

Holloman AFB NM

Executive Officer

2001-2003 New Mexico State University

Alamogordo, NM

Adjunct Instructor

2001-2002 Base Network Control Center

Holloman AFB NM

Officer in Charge

 

2000-2001 San Antonio College

San Antonio TX

Adjunct Instructor

2001 Basic Communications & Information Officer Training

Keesler AFB MS

Student

2001 Officer Training School

Maxwell AFB AL

Trainee

1998 – 2001 Air Force Recruiting Service

Randolph AFB TX

Creative Artist

1993 – 1997 Electronic Imaging Center

Barksdale AFB LA

Graphics Journeyman

 

1990-1993 Base Graphics

Hickam AFB HI

Graphics Apprentice

Awards

Air Force Commendation Medal with oak leaf cluster

Air Force Achievement Medal with two oak leaf clusters

Air Force Good Conduct Medal with three oak leaf clusters

National Defense Service Medal with bronze star

Global War on Terrorism Service Medal

Armed Forces Service Medal

Humanitarian Service Medal

David Marquina

David Marquina

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Nutricionista y Magister Scientiae en Biologí­a Celular. Profesor de fisiologí­a y biologí­a molecular

Dr. Jose Vasconcelos

Dr. Jose Vasconcelos

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Dr. Vasconcelos got his PhD in John Hopkins University. He has a very successful life in the Academia side. He has contributed greatly to his Fields, by conducting researches and publications; and by guiding students in the path to achieve further educations. He shares the mission of the University and he is determined to do his share, in order to attain, all of the Goals.

 

Jorge Vasconcelos is currently a research scientist at the Institute for Security Information of the Johns Hopkins University, working in the fields of Embedded Computing Security and Computing Fundamentals Education, particularly developing undergraduate educational projects for computer architecture and mentoring students implementing IS&A applications in microcontrollers.

 

He is also an Academic Advisor in Atlantic International University, AIU, and a member of the Academic Council.

 

He received his B.Sc. in Computer Engineering (with honors) from the Arturo Rosenblueth Foundation, in Mexico City in 1996, and his M.S.E. and Ph.D. in Computer Science from the Johns Hopkins University (May 2000 and 2008, respectively.)

 

His doctoral research focused in four aspects of Computer Science Education: (i) application of the constructivist paradigm to programming instruction, (ii) creation of instruments for early detection of cognitive abilities required in algorithmic problem solving, (iii) study of individual differences to promote differentiated instruction within the computer science classroom, and (iv) design of curricular models focused in problem solving and algorithmic thinking. In the future, he intends to incorporate computer architecture, hardware control, cryptography, and information security, into his research on computer education.

 

Jorge has taught introductory computer science for almost two decades, and published five high school textbooks for the Mexican market. While at Johns Hopkins, he has served as instructor for Summer Programs (CTY and CS department), developed the courses Algorithmic Thinking and Embedded Systems Fundamentals, and has been co-instructor of Computer Security Architectures. He has also been research assistant in Physics and Astronomy for Universum, Mexico City’s science center, and IT consultant for the Office of International Students (JHU) and the Law Office of Nava-Garces (Mexico).

 

He received doctoral scholarships from the Fulbright Program, Encyclopedia Britannica and CONACyT (Mexican Council for Science and Technology.) He won the George M. L. Sommerman Award for teaching assistant (JHU) and an honorific mention during the Sixth Graduate Research Symposium at the College of William and Mary. He is member of the New York Academy of Sciences, the IEEE and the ACM.

 

 

Education/ Special Training:

2000 – Present           Johns Hopkins University

Baltimore, MD

PhD program in Computer Science

Current research: “Utilization of adaptive testing techniques to detect pre-conceptions affecting introductory programming courses.”

2002 – Present  Cleveland Institute of Electroincs

Associate Degree in Applied Science in Electronics Engineering Technology

1998 – 2000 Johns Hopkins University – Baltimore, MD

Master of Science and Engineering in Computer Science.

1996  Universum, Science Museum

México City

Diploma on Popularization of Science

1990-1996              Arturo Rosenblueth Foundation

México City

Bachelor in Computer Engineering

Thesis’ title: “Development and implementation of basic algorithms for Audio Signal Processing “.

1994    Maurer Institute

México City

Course on Microelectronics

Others: Short courses on Computers and Education (1997), Telescope Utilization (1996), and Basic Astronomy (1995).

 

Languages:

            English: Good writing/ Good conversation

            Spanish: Good writing/ Good conversation

Experience:

 

             

2005 – 2006    Johns Hopkins University – Center for Talented Youth

Summer instructor of Introduction to Programming. Sites: Moravian College, Bethlehem, PA
and Roger Williams University, Bristol, RI

 

2000 – 2005    Johns Hopkins University –Department of Computer Science

Summer instructor of Introduction to Programming in C/C++.

 

1999-present  Johns Hopkins University

Baltimore, MD

Teaching assistant of Computer Systems Fundamentals and Computer Networks

Research assistant of Dr. Masson on studying network simulators for educational purposes.

 

1996 – 1998    Universum, Sciences Museum

México City

Research assistant of the museum’s technical advisor José de la Herrán

 

1996 – 1998    Arturo Rosenblueth Foundation

México City

Faculty staff for undergraduate studies.  Courses taught: Data Structures, File Organization, and Program Design.

 

1990 – 1998    National High School

México City

Instructor of Introduction to Computer Science and Introduction to Programming.

Publications

Programming Language II, Structured programming in C and OOP in C++.   (Textbook for high school).  Publicaciones Cultural, México. Fall 2003. ISBNs: 970-24-0549-1

  “The ethereal information age”. Techno Aspects of  Information Society and New Economy: an Overview. FORMATEX, Spain. March 2003.

Informatics, vols. I and II. (Textbook for high school).  Publicaciones Cultural, México.  Fall 2002.

ISBNs: 970-24-0279-4 (vol. 1, 137pp.) and 970-24-0280-8 (vol. 2, 149pp.).

Introduction to Computing, 2nd ed.  Publicaciones Cultural, México 1997,. 338 pages. Summer 2002.

ISBN: 970-24-0278-6.

Editorial assistant for the guide “Living in Baltimore”, published by the GRO of Hopkins. May 2002.

Computer Science internal reports: Working with Spim (tutorial), Working with Opnet Modeler (tutorial), Basic Programmers guide to Opnet Modeler, five labs for programming projects in Assembler Language, four basic labs to simulate network performance on Opnet, one lab-tutorial to create an Opnet point-to-point network from scratch. Johns Hopkins Computer Science Department, 1999-2002.

Program Construction Manual. Mexican copyright # 167841.  Electronic book (http://www.bibliodgsca.unam.mx/manuales/manual.pdf).  México 2000.

“On numbers, calculators and computers” (essay on computer’s history), Stamps of the Science vol. II FCE, México 1999.  ISBN: 968-166-088-9

 Introduction to Computing.  (Textbook for high school.)  Publicaciones Cultural, México 1997,. 330 pages.

ISBN: 968-439-873-5

Twenty articles about computer technology published in university newspapers and magazines.  University of México, 1996 – 1998.

 Seven papers published in proceedings of Mexican conferences on Computing and Informatics. 1991-1996.

  Twenty one articles published in the students´ magazine “Visión Universitaria” (Most of them about historical aspects of the University of Mexico.)  National High School, México1988 -1999

Awards/Honors:

 

Nomination for the award Leading Educators of the World 2005, by the International Biographical Centre (Cambridge, England), February 2005.

 George M.L. Sommerman Engineering Graduate Teaching Assistant Award for outstanding performance as a teaching assistant within the School of Engineering, JHU, May 5, 2003.

 

Student representing the Computer Science Department for the WSE Annual Report 2002 (September 2002)

 

Fellowships to realize graduate studies within the Johns Hopkins University:

1998 – Present    Computer Science department of the Johns Hopkins University

1998 – Present     Conacyt – México Government

1998 – 2001         Fulbright Program

1998 – 2000         Encyclopedia Britannica

Winner in the contest “Making a book of History of the Science” with a essay about computer’s history.  The contest was sponsored by the Mexican Academy of Sciences, the Presidency’s Council for Sciences and the National Council for Science and Technology. México 1996.

Research assistantship granted by the National Council for Science and Technology (CONACYT, México) to work with the investigator José de la Herrán within Mexico City’s Science Museum.

 Bachelor’s thesis defense approved with honors and winner of the IX National Contest for Computer Science Dissertation, bachelor level.  México.1996.

Scholarship granted by Arturo Rosenblueth Foundation for Bachelor studies.  México 1990 – 1995

Medal “Gabino Barreda” granted by University of Mexico for highest GPA during high school.1991

Winner in contest for student’s newspaper. Sponsored by National High School. México 1989

Dr. Vasconcelos got his PhD in John Hopkins University. He has a very successful life in the Academia side. He has contributed greatly to his Fields, by conducting researches and publications; and by guiding students in the path to achieve further educations. He shares the mission of the University and he is determined to do his share, in order to attain, all of the Goals.

 

Jorge Vasconcelos is currently a research scientist at the Institute for Security Information of the Johns Hopkins University, working in the fields of Embedded Computing Security and Computing Fundamentals Education, particularly developing undergraduate educational projects for computer architecture and mentoring students implementing IS&A applications in microcontrollers.

 

He is also an Academic Advisor in Atlantic International University, AIU, and a member of the Academic Council.

 

He received his B.Sc. in Computer Engineering (with honors) from the Arturo Rosenblueth Foundation, in Mexico City in 1996, and his M.S.E. and Ph.D. in Computer Science from the Johns Hopkins University (May 2000 and 2008, respectively.)

 

His doctoral research focused in four aspects of Computer Science Education: (i) application of the constructivist paradigm to programming instruction, (ii) creation of instruments for early detection of cognitive abilities required in algorithmic problem solving, (iii) study of individual differences to promote differentiated instruction within the computer science classroom, and (iv) design of curricular models focused in problem solving and algorithmic thinking. In the future, he intends to incorporate computer architecture, hardware control, cryptography, and information security, into his research on computer education.

 

Jorge has taught introductory computer science for almost two decades, and published five high school textbooks for the Mexican market. While at Johns Hopkins, he has served as instructor for Summer Programs (CTY and CS department), developed the courses Algorithmic Thinking and Embedded Systems Fundamentals, and has been co-instructor of Computer Security Architectures. He has also been research assistant in Physics and Astronomy for Universum, Mexico City’s science center, and IT consultant for the Office of International Students (JHU) and the Law Office of Nava-Garces (Mexico).

 

He received doctoral scholarships from the Fulbright Program, Encyclopedia Britannica and CONACyT (Mexican Council for Science and Technology.) He won the George M. L. Sommerman Award for teaching assistant (JHU) and an honorific mention during the Sixth Graduate Research Symposium at the College of William and Mary. He is member of the New York Academy of Sciences, the IEEE and the ACM.

 

 

Education/ Special Training:

2000 – Present           Johns Hopkins University

Baltimore, MD

PhD program in Computer Science

Current research: “Utilization of adaptive testing techniques to detect pre-conceptions affecting introductory programming courses.”

2002 – Present  Cleveland Institute of Electroincs

Associate Degree in Applied Science in Electronics Engineering Technology

1998 – 2000 Johns Hopkins University – Baltimore, MD

Master of Science and Engineering in Computer Science.

1996  Universum, Science Museum

México City

Diploma on Popularization of Science

1990-1996              Arturo Rosenblueth Foundation

México City

Bachelor in Computer Engineering

Thesis’ title: “Development and implementation of basic algorithms for Audio Signal Processing “.

1994    Maurer Institute

México City

Course on Microelectronics

Others: Short courses on Computers and Education (1997), Telescope Utilization (1996), and Basic Astronomy (1995).

 

Languages:

            English: Good writing/ Good conversation

            Spanish: Good writing/ Good conversation

Experience:

 

             

2005 – 2006    Johns Hopkins University – Center for Talented Youth

Summer instructor of Introduction to Programming. Sites: Moravian College, Bethlehem, PA
and Roger Williams University, Bristol, RI

 

2000 – 2005    Johns Hopkins University –Department of Computer Science

Summer instructor of Introduction to Programming in C/C++.

 

1999-present  Johns Hopkins University

Baltimore, MD

Teaching assistant of Computer Systems Fundamentals and Computer Networks

Research assistant of Dr. Masson on studying network simulators for educational purposes.

 

1996 – 1998    Universum, Sciences Museum

México City

Research assistant of the museum’s technical advisor José de la Herrán

 

1996 – 1998    Arturo Rosenblueth Foundation

México City

Faculty staff for undergraduate studies.  Courses taught: Data Structures, File Organization, and Program Design.

 

1990 – 1998    National High School

México City

Instructor of Introduction to Computer Science and Introduction to Programming.

Publications

Programming Language II, Structured programming in C and OOP in C++.   (Textbook for high school).  Publicaciones Cultural, México. Fall 2003. ISBNs: 970-24-0549-1

  “The ethereal information age”. Techno Aspects of  Information Society and New Economy: an Overview. FORMATEX, Spain. March 2003.

Informatics, vols. I and II. (Textbook for high school).  Publicaciones Cultural, México.  Fall 2002.

ISBNs: 970-24-0279-4 (vol. 1, 137pp.) and 970-24-0280-8 (vol. 2, 149pp.).

Introduction to Computing, 2nd ed.  Publicaciones Cultural, México 1997,. 338 pages. Summer 2002.

ISBN: 970-24-0278-6.

Editorial assistant for the guide “Living in Baltimore”, published by the GRO of Hopkins. May 2002.

Computer Science internal reports: Working with Spim (tutorial), Working with Opnet Modeler (tutorial), Basic Programmers guide to Opnet Modeler, five labs for programming projects in Assembler Language, four basic labs to simulate network performance on Opnet, one lab-tutorial to create an Opnet point-to-point network from scratch. Johns Hopkins Computer Science Department, 1999-2002.

Program Construction Manual. Mexican copyright # 167841.  Electronic book (http://www.bibliodgsca.unam.mx/manuales/manual.pdf).  México 2000.

“On numbers, calculators and computers” (essay on computer’s history), Stamps of the Science vol. II FCE, México 1999.  ISBN: 968-166-088-9

 Introduction to Computing.  (Textbook for high school.)  Publicaciones Cultural, México 1997,. 330 pages.

ISBN: 968-439-873-5

Twenty articles about computer technology published in university newspapers and magazines.  University of México, 1996 – 1998.

 Seven papers published in proceedings of Mexican conferences on Computing and Informatics. 1991-1996.

  Twenty one articles published in the students´ magazine “Visión Universitaria” (Most of them about historical aspects of the University of Mexico.)  National High School, México1988 -1999

Awards/Honors:

 

Nomination for the award Leading Educators of the World 2005, by the International Biographical Centre (Cambridge, England), February 2005.

 George M.L. Sommerman Engineering Graduate Teaching Assistant Award for outstanding performance as a teaching assistant within the School of Engineering, JHU, May 5, 2003.

 

Student representing the Computer Science Department for the WSE Annual Report 2002 (September 2002)

 

Fellowships to realize graduate studies within the Johns Hopkins University:

1998 – Present    Computer Science department of the Johns Hopkins University

1998 – Present     Conacyt – México Government

1998 – 2001         Fulbright Program

1998 – 2000         Encyclopedia Britannica

Winner in the contest “Making a book of History of the Science” with a essay about computer’s history.  The contest was sponsored by the Mexican Academy of Sciences, the Presidency’s Council for Sciences and the National Council for Science and Technology. México 1996.

Research assistantship granted by the National Council for Science and Technology (CONACYT, México) to work with the investigator José de la Herrán within Mexico City’s Science Museum.

 Bachelor’s thesis defense approved with honors and winner of the IX National Contest for Computer Science Dissertation, bachelor level.  México.1996.

Scholarship granted by Arturo Rosenblueth Foundation for Bachelor studies.  México 1990 – 1995

Medal “Gabino Barreda” granted by University of Mexico for highest GPA during high school.1991

Winner in contest for student’s newspaper. Sponsored by National High School. México 1989

William Mora

William Mora

Position: Academic Tutor
Phone: 1808 215 0476
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States
Nadia Gabaldon

Nadia Gabaldon

Position: Academic Coordinator
Phone: 1800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Nadia is one of our Student Coordinators at AIU. She is a high-energy person with experience in the educational field which makes her a great fit as part of our staff.

Tyler Gleckler

Tyler Gleckler

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Hebrew University of Jerusalem Master of Science (MS) 2018-2021 The University of Edinburgh Chemistry 2017-2017 Reykjavik University Sustainability 2015-2015 Arizona State University Bachelor’s degree

Dr. Silvia Restorff

Dr. Silvia Restorff

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Silvia is one of our Academic Advisors at AIU. As an alumni she knows firsthand how our programs works and has the ability to help our students succeed in achieving their goals. She is a great fit to our academic team and we are proud to have her.

 

Education/ Special Training:

 

 

            Atlantic International University
Doctorate in Political Science

 

Atlantic International University
Master in Political Science

Atlantic International University
Bachelor in Political Science

 

Certificate in Strategic Planning- Attorney College of Guatemala
 Seminar in “National Security Planning Workshop- NSPW”-
National Defense University Studies, in Washington, D.C.

Seminar in “Evaluation of Strategic Security Plan Objectives of the Nation”
National Defense University, Washington, D.C

Political Defense and Strategy Course
National Defense University, Washington, D.C

 Seminar in “Progress of the National Security System”
National Defense University, Washington, D.C

Certificate in National Security Systerm Functions

 

Languages:

 

Italian: Good Writing/ Good Conversation
Spanish: Good Writing/ Good Conversation

 

 

Work/Volunteer Experience:

 

2004-Present

Atlantic International University
Honolulu, HI

Academic Advisor

 

Centurion Security
Consultant and Marketing Manager

Advisor of the Planning Advisory Commission and the National Security Council

National Defense University
Vice-president of the Alumni Association

      

National Defense University
Investigative Assistant in Security


       INEES
Subdirector to the International Corporation and Academic Development

 

INAP
Professional Advisor

Educational Ministry in Germany
Public Worker

TRANSFAIR Products
      Spinnrad Employee

Universidad Popular of Stuttgart, Germany
Spanish Professor

       Universidad Popular of Friedberg, Germany
       Spanish Professor

Irena Travar

Irena Travar

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Ph.D. in Geosciences (module Tourism). With more than 10 years in the areas of education, tourism, and hospitality

Mohamed Ahmed

Mohamed Ahmed

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

a robotics software developer with experience in building reliable pipelines for various autonomous vehicles systems. The pipeline start from preprocessing the raw data that come from different sensors as LiDAR, IMU, Cameras and GNSS, make perception model for each type of data, and build a control for the autonomous vehicle while maintain all the processing in a real time manner.

Dr. Francia Hernandez

Dr. Francia Hernandez

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Centro de Investigación en Alimentación y Desarrollo Doctor of Philosophy (PhD), Social Sciences 2015-2018 Universidad de Sonora Master of Commerce (MCom), International Trade 2009-2011 Universidad del Noroeste, A.C. Bachelor of Business Administration (BBA), Business 2004-2007 University of Arizona Media Arts 1998-2002

Dr. Ariadna Romero

Dr. Ariadna Romero

Position: Advisor Coordinator
Phone: 1 808 215 0482
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

As an Academic Coordinator, Ariadna is an integral part of our administrative team. She works closely with the university administrators, school boards and other relevant educational personnel to ensure compliance with educational standards, school and student performance.

She works in conjunction with the Academic Department, principals, school boards and teachers to develop and implement educational technology, instructional materials and curriculum programs to enhance student learning and achievement.

Ariadna is a key element in the success of the representation in Mexico of AIU. She is also in charge of Admissions, bringing confidence and information to prospective and current students, helping them to achieve their dreams and goals through the provision of a sustainable education.

Education/ Special Training:

Present Atlantic International University

PhD in Higher Education

1996 Pacific Western University

MA Graphic Design

1985 – 1988 National Autonomous University of Mexico

BA Graphic Design

Languages:

English: Good writing/ Good conversation

Spanish: Good writing/ Good conversation

French: Good writing/ Good conversation

Experience:

2001 – Present Atlantic International University

Chief of Admissions, Academic Coordinator and Counselor

2000-2001 Albox Editorials, S. A. de C. V.

Art Director

1993 – 1996 UNIDES [AIU]

Academic Coordinator, Chief of Admissions

1989-1993 Signus Graphic Design

Art Director

Mónica Fonseca

Mónica Fonseca

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

a Biology teacher, and I have a master’s degree in Biomedical Sciences: Biochemistry and Molecular Biology. Services that I offer. 1. Advising and consulting for research projects and works 2. Classes on the Biology, Biochemistry, Molecular Biology, Genetics and Biochemical Nutrition Line.

Hilda Londoño

Hilda Londoño

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Con un recorrido de 23 años en el área de Producción y Logística, en la Industria autopartistas de Colombia, lo que le permitió descubrir que Excel no es solo una simple herramienta de hojas de cálculo, ya que tiene muchas opciones para optimizar sus procesos, hacer productivo su trabajo y poder entregar información de valor a sus superiores.

Heather White

Heather White

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Nationally Certified School Psychologist with more than twelve years of experience in Montessori education.

Belen Silva

Belen Silva

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Chemical Engineer (UBA). Carbon accounting, mitigation and offsetting for public and private sector companies. Sustainability Advisor. SEO writer specialized in the environmental/climate change niche.

Babatunde Olabode

Babatunde Olabode

Position: Academic Advisor
Phone: 1 808 215 0498
Email: [email protected]
Categories: Academy, AIU Staff
Location: United States

Self-motivated, determined, hardworking and passionate person, who handles all responsibilities given to me with utmost care.
I work well with people with a great team spirit.
I am able to adapt to any working condition and flexible to learn new skills and take correction with the aim of achieving the best in any givenassignment.
I work with great competence and problem solving abilities and also can provide phisical support where needed.

Academic Advisor, Atlantic International University, Hawai –
Hawail, United State
Oct 2019 – Mar 2022
• As an Academic Advisor, with Atlantic International University, Hawaii, United States.
• I guide all categories of students from certificate level to post doctorate degree levels to success.
• I mark and grade students’ assignments of various levels submitted to my office portal.
• I answer all questions and enquiries sent to me by my students to ensure they are properly guided.
• I motivate students of four categories every day. A. Those who have paid all their payments up to date and have submitted their assignmentsand the need to continue. B, those who have pad up to date but are lacking in one assignment or the other and needs to be reminded to do so.,C. Those who have their assignment up to date but payments are not UpToDate. D. those who have not updated their assignments and payment.
• I also guide students who needs to get their payment done or find it difficult to pay with various means of payment acceptable.
• I prepare them for graduation and ensure they graduate successfully, I have had one hundred and seven students in my last assignment
• I also guide students who needs to get their payments done or find it difficult to pay with various means of payment acceptable.
• I prepare them for graduation and ensure they graduate successfully
• I prepare questions for test and exams for students and attends webinars to present seminars.

Admissions Counselor/Recruiter, Atlantic InternationalUniversity, Hawai –
Hawail.UnitedStates
Apr 2018 – Sep 2020
• Working with the University to call prospective students whom i have to interview, counsel about the important of education and the role Ouruniversity can play to get their goals achieved.
• I examine their qualifications and send it to the academic board to examine
• I ask them to explain how they intend to get their payments done and encourage them to put value for education.
• I send them the school method of payments and guide them to pay.
• I put several calls to students who are ready to pay their fees.
• I also set up watts App platform to follow up prospects who intend to be students.
Facilitator, SOLIYA –
U.S. 54 West 40th St
Apr 2019 – Apr 2022
Experience
Soliya is an industry leader in Virtual Exchange: high-impact inter- and cross-cultural education facilitated through digital technology.
1. I facilitate students in a successful dialogue programs to ensure they have a smooth discussion on a given topics
2. I ensure that students from different universities and Countries are guided about the rules of engagement as a participant in the exchangeprogram
3. I fill out the sessions notes after each session.
4. I work with my co facilitator to ensure this is done.
5. I have facilitated 4 programs at different semester
a. Connect Express
b. Connect global
c. Connect circles
d. Connect Collaborate
Facilitator, National Open University –
Sokoto. Nigeria
Mar 2007 – Sep 2010
NATIONAL OPEN UNIVERSITY
1. I serve as facilitator in the subjects of Peace and Conflict Resolution
2. I teach and guide the students through the manual the University has provide for the students
3. Students are expected to submit assignments to me for marking and grading.
4. Students are also prepare for examinations and be guided with the rules and regulations of sitting for such exams
Chief Executive Officer, Teba Edut Development Initiative Int. –
Sokoto.Nigeria
Feb 2016 – Present
1. I set out the structure of the organization
2. Present the structure of the organization to the various leaders and encourage them to work
3. Give seminar presentations of the overview of the organization
4. Work on administrative capacities of the organization
Media Director and Consultant., NEW DAWN TV INTERNATIONAL –
ONLINE
Jan 2019 – Apr 2022
This is an online multimedia TV online with the goal of connecting people of different background and ideology and encouraging them to be theirbest and be hopeful about life.
I serve as the Media Director and Consultant.
I am responsible for organizing the content and structure of each production
I am responsible for crafting the goals of each series in the Television show
I am responsible for inviting audience who will form the live audience for the show.
I also supervise the technical crew to get a smooth production
problems Solving
Critical Thinking
Flexibility
Skills
Communication-
Teamwork
Organisation
Creativity
Emotional Intelligence
Post Doctorate Degree Conflict Resolution and peace Building
Jan 2017 – May 2019
Atlantic International University – Hawaii United States
This is a course under the School of Social and Human Studies on the subject of Post Doctorate of Conflict Resolution and Peace Building. Thisis an online degree.
Doctorate degree Peace and Conflict Resolution
Feb 2014 – Dec 2016
Atlantic International University – Hawail, United States
This degree was obtained from Atlantic International University under the school of Social and Human Studies degree of Doctor of PhilosophyPhD in peace and Conflict Resolution.
Master Political Science
May 1999 – Oct 2003
Usamanu Danfodiyo University – Sokoto, Nigeria
Bachelor Political Science
Feb 1990 – Jun 1995
Usmanu Fodiyo University – Sokoto, Nigeria
Post graduate diploma Education
Feb 2010 – Mar 2012
Ahmadu Bello University Zarai, Nigeria – Zaira, Nigeria
Diploma Social Innovation
Apr 2015 – May 2015
University of Peace – United Staes
It is an intensive professional development program
Certificate Educating in Changing Times< Reflect,Retink,Rebuild
Feb 2014 – Mar 2014
University for Peace – Costa Rica
Certificate Regenerative Leadership
May 2015 – Jul 2015
University for peace – Costa Rica
certificate Mission Impossible, Measuring Outcomes and Impact
Jun 2014 – Jun 2014
University of Peace – Costa Rica
certificate Skills for effective Negotiations
May 2012 – May 2022
University of Peace – Costa Rica
Certificate Interfaith Conflict Resolution
May 2011 – Jul 2011
United States Institute of Peace – United States
Certificate Conflict Analysis
Mar 2011 – Apr 2022
United States Institute of peace – United States
Education
Certificate of completion Methods of Analysis and ~Research for peace
Jul 2012 – Aug 2012
Transcend Peace University – Germany
Certificate of completion Challenges of Democracy and Just Peace
Jul 2011 – Aug 2011
Transcend Peace University – Germany
Certificate of Completion Advanced Conflict Transformation
Mar 2011 – May 2011
Transcend Peace University – Germany
certificate of Completion Basic Facilitator Training
Mar 2016 – Apr 2016
SOLIYA – United Staes
English,Yoruba and Hausa

Robenson Jean

Robenson Jean

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Universidad Nacional Autónoma de México Master of Engineering (MEng), Renewable Energy 2021-2023 Université d’État d’Haïti Bachelor of Science (BS), Electromechanical Engineering 2012-2017

Dr. Milton F. Marin Cedeño

Dr. Milton F. Marin Cedeño

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Milton, is a very enthusiastic person that always delivers excellence to his students. As an Academic Advisor at AIU, he always does his best to fulfill the expectations of our students. He is very proud to form part of the team that helps people around the world, to fulfill their dreams and hopes, for a betterment, of their overall life. 

 

Education/ Special Training:

 

 

            Atlantic International University

Honolulu, Hawaii

Doctor of Engineering

Universidad La Salle

Doctor of Education

 

            National University

San Diego, CA

Master of Business Administration

 

Universidad Autónoma de Centro América

San Pedro de Montes de Oca, Costa Rica

Bachelor of Computer Information Systems

Languages:

 

Spanish: Good Writing/ Good Conversation

 

 

Work/Volunteer Experience:

 

2004-Present

            Atlantic International University

Honolulu, HI

Academic Advisor           

 

2010-2015 Componentes El ORBE

Director of Sales – Private Sector

2008- 2010 Managed Security Agency S.A.

Director of Business Development

2007- 2008 Deposito Las Gravillas

Executive Director

2004- 2007 Corporación de Operadores de Servicios Telemáticos.

General Manager

2002- 2003 Codisa Software Corp.

Commercial Director of Central America

2000- 2002 Zeta Internacional

Development Manager

Juan Bendeck

Juan Bendeck

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

University of California, Irvine Virtual Reality 2018-2018 Tecnologico de Monterrey Master of Education (MEd) 2013-2015 Fundación Universitaria Luis Amigo Bachelor of Technology (BTech), Technology Management 2011-2012 Systems Engineer Bachelor of Technology (BTech) 2001-2006

Rachel N

Rachel N

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

English Teacher to Speakers of Other Languages

Raul Lopez

Raul Lopez

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Ha trabajado en varias funciones para algunas empresas de Fortune 500 como ingeniero de seguridad, administrador de seguridad, arquitecto de seguridad, auditor de cumplimiento de seguridad y gerente de proyectos de seguridad de TI.

Olga Camacho

Olga Camacho

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Profesional con más de 24 años de experiencia en el desarrollo de sistemas de información e inteligencia de negocios. Especialidad en el área de marketing digital e Inbound marketing.

Alejandra Rosas

Alejandra Rosas

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Profesional de Recursos Humanos con más de 11 años de amplia experiencia en Gestión de Recursos Humanos. Actualmente, se desempeña como Jefe de Departamento para empresas Fortune 500 en diferentes industrias.

Arturo Romero

Arturo Romero

Position: Academic Advisor
Phone: 1800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Universidad Nacional Autónoma de México. High School. Escuela Nacional Preparatoria No. 8 Miguel E. Schulz. Av. Lomas de plateros s/n. Merced Gómez. México, D.F. 1985-1987
Escuela Activa de Fotografía. Professional photography course. Presidente Carranza No.138, Coyoacán. México D.F. 1987-1990.
Escuela Activa de Fotografía. Diploma: “Graphic design applied to photography”. Cuicuilco No.79 Col. Letrán Valle. México D.F. 1991-1992.
Universidad Autónoma del Estado de Morelos. Arts Faculty. Cinematography Diploma. Av. Universidad 1001, Col. Chamilpa. Cuernavaca, Morelos. 2002-2003.
Universidad Nacional Autónoma de México. Politic and Social Sciences Faculty. Bachelors in Communication, with an specialty in production. Circuito Mario de la Cueva s/n Ciudad Universitaria. Pasante en proceso de titulación. 2008 – 2014.
Atlantic International University. Bachelor in Science, with a major in Communications and Digital Media. Pioneer Plaza. 900 Fort Street Mall 40 Honolulu, Hawaii, Estados Unidos. 2004-2007.
Academic experience in English Language:
Centro Cultural Benjamín Franklin. Parroquia 830, Col. Del Valle, México. D.F. Diploma: Basic English, levels 1-9 y 3 advanced courses. 1979-1982.
Centro de estudios de lenguas extranjeras de la Universidad Autónoma del Estado de Morelos. English Teching course, for the TKT certification. Plutarco Elías Calles No. 13 Col. Fracc. Club de golf, Cuernavaca, Morelos. 2011-2012.
Cambridge University. Teachers Knowledge Test Certification, TKT. Grading: Band 3, modules 1, 2 and 3. 2012.
Centro de enseñanza de lenguas extranjeras de la UNAM (CELE). English language dominance certification. Ciudad Universitaria, CDMX, 2014.
Teaching Working experience.
Escuela Activa de Fotografía. – Medium and large format product photography. Ignacio Comonfort 2
Colonia Centro. Cuernavaca, Morelos. 2004 – 2006
Colegio Lancaster, – Basic photography teacher. 2005 – 2008. High school english teacher. 2006 – 2008.
Preparatoria, Galeana 88, Colonia Las Palmas-centro. Cuernavaca, Morelos.
Yecolti, Organización no gubernamental. – Basic and intermediate levels English teacher – Photography
and photo journalism courses. Félix cuevas 688-201, Col. Del Valle, México D.F. 2004-2011
Universidad Tec Milenio. – “Lengua adicional el Español” teacher, English teacher, levels 4, 5 y TOEFL.
“Great Universal Writers” and “Expresión Literaria” techer. Meleleucas No. 179, Col Lomas de Cuernavaca,
Temixco, Morelos. 2015 – 2017.
– Music workshop professor. Meleleucas No. 179, Col Lomas de Cuernavaca, Temixco, Morelos. 2015
– 2015.
Universidad Cuauhnáhuac. – English teacher, advanced leves 3-6.
– Communications teacher. (Redacción, Taller de radio, Opinión Pública y Propaganda, Historia de las
doctrinas filosóficas, Teorías del lenguaje, Teorías de la comunicación, Taller de guión). Jacarandas
333, col. Lomas de Cuernavaca, Temixco Morelos. 2016
Universidad Americana de Morelos. Photography I, II, & III teacher. Calle del Ejido No 30 Col, Ejido de
Acapantzingo, Cuernavaca, Morelos. Colegio Pillicao. History I y II, secondary school level. Benito Juárez
No.182, Centro, Jiutepec, Mor.
Atlantic International University. Students Advisor Pioneer Plaza. 900 Fort Street Mall 40 Honolulu, Hawaii,
Estados Unidos. 2007…
Work experience in mass media:
Journal: La Unidad. Durango 223 col. Roma. Editor, Flat paper corrector. 1990-1991.
Arquitectural office PRECOR. Cda.de ReformaNo.4 Tlacopac, San Ángel. México D.F. Graphic designer. 1991-
92
Magazine: Macrópolis. Watteau No.54 col. Nonoalco Mixcoac. Laboratorist, assistant editor, graphic
reporter. 1992-1993.
Newspaper: El Universal Gráfico. Bucareli No.8, Col. Centro. México D.F., graphic reporter. 1994-1995.
Magazine: Media Comunicación. Sauzales No. 43-B, 502 col. Granjas Coapa, graphic reporter. 1995 – 2000.
Jornal: El Municipal. González de Cossío No.843 Col. Del Valle., graphic reporter. 1995-1996
Newspaper: La Jornada. Balderas No.68 Col. Centro. México D.F., graphic reporter. 1997.
Newspaper Unomásuno. 1era Cda. De Correggio No.12 col Mixcoac., graphic reporter. 1997-1998.
Magazine: Trabajo Social. Escuela Nacional de Trabajo Social. UNAM Ciudad Universitaria, México D.F.,
graphic reporter. 1998-1999.
Magazine: Corazón Grupero. Editorial Carma. Gemelos No.112 Col Prados Churubusco. , graphic reporter.
1998-2001.
Grupo editorial Televisa. Revista Geomundo., Santa Fe, graphic reporter. 1999.
Revista Popular Mechanics, collaboration 300, 2006.
Revista ¡OK!, collaboration, editorial portraits. 2006.
Deuscht Press Asociation- DPA. Av. Cuauhtémoc No.16-3er piso, col. Doctores. México D.F Feautures
graphic reporter. 1999 a 2003.
Magazine: Electrohogar. La Martine 160, col. Polanco México D.F., graphic reporter. 2006 – 2007.
Notimex, Mexican State News Agency. Morena 110 col. Del Valle. México D.F., graphic reporter
correspondant. 2006 – 2011.

Abdullah Mughees

Abdullah Mughees

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

I am doing a Ph.D. in Electrical Engineering from NUST, and my research focus has shifted toward innovative engineering projects. Previously, I completed my Master’s degree in Electrical Engineering from FAST NUCES University and my 4 years Bachelor’s course in Electrical Engineering from GCUF. I have an “O-Levels” and “A-Levels” degree from the University Of Cambridge. My English is perfect in all aspects.

Vilma Chinchilla Valderrama

Vilma Chinchilla Valderrama

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Petroleum Engineer | LaTeX | TikZ | Data Entry

Dr. Mohammad Shaidul

Dr. Mohammad Shaidul

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Mohammad is one of our Academic Advisors at AIU. He has multiple degrees in the field of Chemical Engineering and has assisted students in the past in this field. He has been working as an Academic Advisor at AIU, USA since November 2013 and has supervised more than 50 students (chemical and environmental disciplines of B.Sc, Msc, and Ph.D courses) in completing their academic program at AIU. We are very proud to have Mohammad as part of our faculty team.

Education/ Special Training:

 

 

            Atlantic International University

Academic Advisor

 

PhD in Chemical Engineering

 

Chalmers University of Technology

MSc in Chemical and Environmental Engineering

Bangladesh University of Engineering & Technology

BSc in Chemical Engineering

           

Languages:

 

English: Good Writing/ Good Conversation

French: Good Writing/ Good Conversation

Swedish: Good Writing/ Good Conversation

 

 

Work/Volunteer Experience:

 

2004-Present

Atlantic International University

Honolulu, HI

Academic Advisor

 

University of Sydney

Teaching Assistant

      

Undergraduate Course Tutor

Chemical Engineer

 

Scientific Officer

 

 

Projects Completed:

 

  1. Experimental work and modeling of membrane ozonation process for the separation of Endocrine Disruption Chemicals (EDCs) from water and waste water at The Kong University of science and Technology (HKUST), jointly finance by UGC, Hong Kong and Veolia Environment, France.
  2. Transmission losses characterization and minimization in biodegradable Microstructured Polymer Optical Fiber (MPOF) at the department of chemical engineering collaboration with Optical Fiber Technology Centre (OFTC), University of Sydney, AUSTRALIA.
  3. Mathematical modeling of Biofilm for biological Waste water treatment at the University of Sydney.
  4. Master’s thesis on: “Supercritical Water Oxidation of sewage sludge/waste water treatment for the 21st century in South Asia studied by ASPEN simulation”. I have also conducted a case study on the limit of district heating in Gothenburg-studied by life cycle methodology (LCA). This was a study on environmental performance of a particular process.
  5. In my Undergraduate Thesis I successfully completed my thesis on SIMULATION OF GAS PROCESSING PLANT by HYSIS SIMULATOR. I have designed a 40 MT/D Toilet soap plant taking Lever brothers as a model.

ACTIVITIES AND INTERESTS:

  • Member, Sveriges Ingenjörer (The Swedish Association of Graduate Engineers) (Membership ID: 10552647)
  • Member, Institute of Engineers Bangladesh, IEB (M-18815)
  • Members, Chalmers ingenjör förening (Sweden)

Web site links for his publications are:

  1. Bookhttps://www.lap-publishing.com/catalog/details//store/ru/book/978-3-659-51253-7/ozonolysis-technique-to-treat-endocrine-disruption-chemicals(LAP LAMBERT Academic Publishing, OmniScriptum GmbH & Co. KG, Germany)

 

Journals:

  1. https://sites.google.com/site/photonxing/home/journal-of-water-research(Journal of Water Research, Photon, Impact Factor: 3.15)
  2. http://www.banglajol.info/index.php/JCE/article/view/7238(Journal of Chemical Engineering, IEB, DOI: 10.3329/jce.v25i0.7238)
  3. https://sites.google.com/site/photonjournalresearch/home/journal-of-water-research(Journal of Water Research, Photon, Impact Factor: 3.15)
  4. http://ejournalofsciences.org/archive/vol2no10/vol2no10_12.pdf(International Journal of Science and Technology, IJST)
  5. http://ejournalofsciences.org/archive/vol2no4/vol2no4_12.pdf(International Journal of Science and Technology, IJST)
  6. http://www.inderscience.com/info/inarticle.php?artid=64428(Journal of Oil, Gas and Coal Technology (IJOGCT), 2014. Impact Factor: 0.43)
Amiakhor Ejaeta

Amiakhor Ejaeta

Position: Academic Tutor
Phone: 1 808 450 2749
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

To utilize my educational background, skill sets and professional experience to contribute to the overall success of an organisation as well as advance for my personal growth and career objectives.

academic background

Mustard Seed Computer Training School2012

Certificate in Data Processing
Zenith School Of Computer Studies, Ojo, LagosState2000

Nigerian Institute Of Journalism, Ogba-Ikeja, Lagos 1999

National Open University of Nigeria

Ojo High School, Ojo Lagos

Diploma in Computer Utilization
Diploma in Marketing and Management
B.Sc Accounting
W. A. E. C. / W. A. S. C. E.1992
Experience

Sep. 2012 -2013

SEPT 2007 –NOV. 2010

FEB 2007-SEPT.2007

MAR 2006 –DEC. 2006

NOV. 2003-MAR 2006

NOV. 2002-NOV 2003

ARBITRAGE CONSULT LTD

BLOCK D2, FLAT 2 OROSANYE BLOCK, FINANCE QUARTERS, WUYE, ABUJA

Special Duties Officer, Office of The Managing Consultant

Producing documents, briefing papers, reports and memos;
Organising and attending Meetings and ensuring that the Managing Consultant is well prepared for such meetings
Answering calls and handling queries
Supervising junior staff.
Sourcing and ordering stationery and office equipment,
laising with staff and clients
organizing travel
Preparation of staff salaries

UNITED BANK FOR AFRICA (U.B.A)

11/13 WAREHOUSE RD. APAPA [City, ST]

Head, Customer Service Department

Internal/External Customers Management Supervising And Training Of Subordinates
UNITED BANK FOR AFRICA (U.B.A)

11/13 WAREHOUSE RD. APAPA [City, ST]

Teller Cashier

Cash/Teller Handling Management

UNITED BANK FOR AFRICA (U.B.A)

ADEOLA HOPEWELL BRANCH, VI, LAGOS [City, ST]

Teller Cashier

Cash/Teller Handling Management
UNITED BANK FOR AFRICA (U.B.A)

FALOMO BRANCH, IKOYI, LAGOS [City, ST]

Teller Cashier

Cash/Teller Handling Management
UNITED BANK FOR AFRICA (U.B.A)

JOS BRANCH, PLATEAU [City, ST]

Bulk Teller/Cashier

Cash/Teller Handling management
1992 – 2000

AZUBUIKE FROZEN FOODS LAGOS.

Cashier/Receptionist [City, ST]

Cash Handling/Management
AWARDs

BEST TELLER 2006

UNITED BANK FOR AFRICA, ADEOLA HOPEWELL VICTORIA ISLAND.

BEST CUSTOMER SERVICE STAFF 2008

UNITED BANK FOR AFRICA,

11/13 WARE HOUSE ROAD APAPA

Interests

Meeting People, Reading,Singing, Etc

skill

High organisational ability
A good communicator
Ability to work with little or no supervisions
Good inter-personal relations
Excellent interpersonal relationship with colleagues,
Good project management experience gained through involvement in development and freelance projects
Highly detail-oriented

Dr. Kanbiro Orkaido

Dr. Kanbiro Orkaido

Position: Academic Advisor
Phone: +1 (808) 400-0573
Email: [email protected]
Categories: Academy
Location: United States

At Atlantic International University (AIU), we are proud to highlight the remarkable contributions of Dr. Kanbiro Orkaido Deyganto, our esteemed Academic Advisor and researcher. Dr. Deyganto embodies the spirit of our mission, transforming educational dreams into reality and inspiring students to reach their full potential. See his story @ https://www.aiu.edu/news/aiu-graduate-and-academic-advisor-has-been-added-to-the-editorial-boards/

A Beacon of Positive Change and Inspiration 

Dr. Kanbiro is dedicated to being a source of positive change, motivating students to navigate challenges and seize opportunities. His commitment to transforming obstacles into stepping stones reflects AIU’s mission to empower individuals in their academic pursuits and personal growth. His vision is to advance as full professor at AIU and strengthen global research network.

 

Advancing Global Research and Academic Excellence

He is young scientific researcher with a focus on entrepreneurship, sustainable development, and the digital economy, Dr. Kanbiro addresses critical issues impacting our world today. His research aligns seamlessly with AIU’s commitment to advancing global research and academic excellence while upholding human rights. By collaborating with international networks, he empowers students to contribute meaningfully to our collective mission of cultural development.

Supporting the Implementation of the Sustainable Development Goals (SDGs)

Dr. Kanbiro recognizes the significance of the Sustainable Development Goals (SDGs) and is dedicated to providing personalized mentorship to help students produce impactful research that aligns with these goals. His efforts particularly excel in areas such as Quality Education (Goal 4) and Sustainable Communities (Goal 11), reflecting our vision to empower students to tackle global challenges through sustainable practices.

Personalized Mentorship and Lasting Impact

Dr. Kanbiro is young and role model educator.  His approach to advising is rooted in personalized mentorship/lecturing/advising, fostering academic excellence while nurturing each student’s unique strengths. This aligns with AIU’s mission to promote diversity and support the evolution of a more equitable world.

Joining Hands for a Brighter Future

Dr. Kanbiro invites students to join him in creating a brighter future. Together, we can cultivate an environment where collaboration and innovation thrive, empowering students to realize their full potential and contribute to a more effective administration of our global community.

Turning Challenges into Opportunities through Andragogic Education

Every challenge presents an opportunity for growth, and Dr. Kanbiro encourages students to embrace obstacles as chances to learn and evolve. This philosophy is a cornerstone of AIU’s educational approach, emphasizing the transformative power of education.

Meet Your AIU Advisor Today!

We invite you to schedule a Zoom meeting with Dr. Kanbiro to discuss your academic journey and future aspirations. Together, you can chart a course that aligns with AIU’s mission of empowering individuals through education and promoting a sustainable future. To schedule your meeting, please click on the following link: [Schedule a Meeting]( https://calendly.com/k-orkaido-aiu/schedule-academic-evaluation-session ).

Syed Hassaan Ali

Syed Hassaan Ali

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

,I am very excited to branch into the world of freelancing. I’ve developed many products all the way from concept to production and implementation

Deborah Rodriguez

Deborah Rodriguez

Position: Tutor Coordinator
Phone: 1 808 215 0423
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Tutor Coordinator Deborah Rodriguez

Objective

Obtain a position in which I can achieve the goals of the company, obtain experience, and acquire new knowledge that will help me to develop my skills in the company.

Experience

Tutor at Atlantic International University, Honolulu, Hawaii January 2018 to Present

Family Service Specialist at Telamon Corporation, Glennville, Georgia March 2015 to July 2017.

Medical Care Management at American Health Medicare and Triple S Advantage in Guaynabo, Puerto Rico July 2013 to August 2014

Nursery Care Unit at Hospital Hima San Pablo in Caguas, Puerto Rico May 2012 to July 2013

 

Medical- Surgical Nursing II practice at Hospital La Concepción in San Germán, Puerto Rico 2011

 

Medical- Surgical Nursing I practice at Hospital La Concepción in San Germán, Puerto Rico 2010

 

Pediatric Nursing practice at Hospital La Concepcion in San German, Puerto Rico 2010

 

Maternity Nursing practice at Hospital Perea in Mayaguez, Puerto Rico 2009

 

Psychiatry Nursing Practice at Casa Colón Rivas in Moca, Puerto Rico 2008

Education

Masters Degree in International Business Administration and Human Resources – Universidad Interamericana de Puerto Rico Recinto de Ponce/ November 2017-Present

Graduate Certificate in Health Care Management- Columbia Southern University/ January 2015- May 2016

 

CPR, AED, and First AID Program Certificate Course – January 2015

 

CPR (Cardiopulmonary Resuscitation) – American Heart Association (2015)

 

Bachelor Degree in Science of Nursing – University of Puerto Rico at Mayagüez Campus/ August 2006- December 2011

Associations

National Students Nursing Association

The Honor Society of Nursing, Sigma Theta Tau International

Nursing Students Association UPR Mayagüez

Skills

Language:

Spanish/ High level

English/ Moderate level

 

Informatics:

Knowledge of the use of the programs: Power Point, Word and Excell

Knowledge of the use of a data base (CCMS, Health Suite), Interqual guidelines, Cybernetic Web, and ChildPlus.

Reference

Avaible upon request.

Petar Stanic

Petar Stanic

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Excel Wizard | Skilled Financial Analyst | Data Analysis Expert

Vedran Obućina

Vedran Obućina

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Interdisciplinary social scientist and theologian

Leidulataja Jimenez

Leidulataja Jimenez

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Preschool teacher, curriculum developer, and content creator in the field of Education. She specializes in creating meaningful content related to her sufficient and wide array of experiences in the field.

Antonio Berrio

Antonio Berrio

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Diseñador arquitectónico de formación con un Máster en Diseño Arquitectónico. Especialista en BIM (Revit) y entusiasta del modelador 3D (Rhinoceros), con amplios conocimientos de AutoCAD, Sketch-Up, 3D Studio, Lumion y Adobe Package.

Dr. Edward Lambert

Dr. Edward Lambert

Position: Academic Director
Phone: 1808 214 94 30
Email: [email protected]
Categories: Academy, Board Members
Location: Honolulu, United States

 Edward is one of our Tutors at AIU. He is a high-energy person with experience in the educational field. He is efficient, detail-oriented, organized and creative which makes him a great fit as part of our staff.

Education/ Special Training:

            Atlantic International University

Doctorate in Economics

            Tai Hsuan Institute

Masters of Acupuncture & Chinese Herbal Medicine

            New Mexico State University

            Bachelors in Social Work

           

Languages:

English: Good Writing/ Good Conversation

Spanish: Good Writing/ Good Conversation

Work/Volunteer Experience:

2004-Present

Atlantic International University

Honolulu, HI

            Academic Tutor           

       Universidad de Concepcion

English Teacher

       Private Practice

       Acupuncturist

       Flagstaff Native Plant & Seed

       Financial Manager Bookkeeper

      Mountain Sports

           Financial Manager Bookkeeper

Nicolás Valderrama

Nicolás Valderrama

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

¡Hola! Soy Nicolás Sáez, un profesor entusiasta de Física y Matemáticas, cuya pasión trasciende los confines del aula para abrazar el arte y la exploración del mundo natural. A mis 35 años, me embarco diariamente en un viaje intelectual y artístico, enriquecido actualmente por estudios de posgrado en Ciencias con mención en Física.

Syed Qasim Shah

Syed Qasim Shah

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Dedicated academician with over 10 years of experience in teaching, research and administration. Combines a focus on student achievement with a passion for scholarly work, presenting and attending international conferences, and serving in peer-reviewed journals as Board of Editors and Reviewer.

Magaly Masis

Magaly Masis

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Universidad Libre de Costa Rica Bachelor’s degree, criminology Universidad de las Ciencias y el Arte de Costa Rica Bachelor’s degree, Law 2016-2018 Universidad Latina de Costa Rica Bachelor of Business Administration (BBA) 2010-2015

Ariela Schulman

Ariela Schulman

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Universidad de Buenos Aires / UBA 2012-2012 Harvard University 2009-2009 Universidad de Palermo 2002-2004 Universitat Oberta de Catalunya 2001-2002 Universidad de Buenos Aires 1996-2000

Christine Udarbe

Christine Udarbe

Position: Academic Advisor
Phone: 1800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Christine’s mission as an Academic Advisor is to ensure the quality of the education that our students receive. Her experience in the past and present give her all the necessary tools to connect and be able to guide our students all the way, to achieve the goals that they established with themselves when they first enrolled with Atlantic International University.

 

Education/ Special Training:

1991–1995 University of Hawaii at Manoa

Honolulu, HI

Bachelor of Arts in Zoology

1996–1998 University of Hawaii at Manoa

Honolulu, HI

Master of Education in Teaching

Languages:

English: Good Writing/ Good Conversation

Experience:

2007– Present Ala Wai School

Honolulu, HI

Vice Principal

2007 – Present Atlantic International University

Honolulu, HI

Academic Advisor

2006 –2007 Kaimuki High School

Honolulu, HI

Vice Principal

2003– 2007 Kaimuki High School

Honolulu, HI

Registrar

2001 – 2003 Kaimuki High School

Honolulu, HI

Chemistry Teacher: Advanced Placement and General

2000 – 2001 Kalaheo High School

Honolulu, HI

Science Teacher: Biology and Chemistry

1998 – 2000 Kaimuki High School

Honolulu, HI

Science Teacher: Biology and Environmental Science

Dr. Ofelia Love

Dr. Ofelia Love

Position: AIU Director
Phone: 1 808 521 1868
Email: [email protected]
Categories: Academy, Directors
Location: Honolulu, United States

Dr. Ofelia Love is the Director at AIU. She has demonstrated throughout her professional career that she is a goal oriented person, always focus on excellence. We are very proud to have such a hardworking and efficient person, for our students are always satisfied with the help and assistance provided by her.

 

Experience

2010-Present Atlantic International University Honolulu, HI

2009-2011 Royal Academy of Ballet Honolulu, HI

2003-2010 Dance Studio No. 1 West Los Angeles, CA

 

Education

2014-2016 Doctor of Philosophy in Education

2009-2012 Master of Arts in Education

2005-2009 Bachelor of Arts in Journalism and Central American Studies

Lana Stamenkovic

Lana Stamenkovic

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

The Faculty of Organizational Sciencies 2009-2011 The Faculty of Philology Literature 1997-2011

Elif Kalayci

Elif Kalayci

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Middle East Technical University (METU) Doctor of Philosophy (PhD), Science and Technology Policy Studies 2006-2012 Texas A&M University Master of Business Administration (MBA), Business Administration 1994-1996 Bosphorus University Bachelor of Science (BS), Economics 1989-1992

Nosha Assareh

Nosha Assareh

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

PhD,Data analyst,Programming, Statistical analyst

Cheila Ramirez Brens

Cheila Ramirez Brens

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Médico con trayectoria en la industria de outsourcing de productos empresariales y gestión de la salud, con especialidad en nutrición clí­nica, con estudios de posgrado también en gestión, liderazgo, nutrición deportiva y dietética.

Patricia Marin

Patricia Marin

Position: Academic Assistant
Phone: 1800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Patricia Marin is an Academic Assistant at Atlantic International University in Honolulu, Hawaii, where she supports the academic team in delivering a seamless and enriching educational experience for students worldwide. With a keen eye for organization and a dedication to academic excellence, Patricia assists in managing course materials, coordinating schedules, and supporting faculty members in their instructional roles. Her work ensures that both students and staff have the resources and guidance needed for a successful academic journey at AIU.

Eka Bobokhidze

Eka Bobokhidze

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

University of Chester Master of Science (MS), Public Health Nutrition 2019-2020 Tbilisi State Medical University Master’s degree, Health Promotion 2015-2017 Tbilisi State Medical University Bachelor’s degree, Public Health 2011-2015

Rabia Liaquat

Rabia Liaquat

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Rabia has 8 year of experience in Mathematics with expertise in Graph theory.

Dr. Adesida Oluwafemi

Dr. Adesida Oluwafemi

Position: Academic Tutor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

Academic and Professional Qualifications with Dates:

 

Unilorin Primary School              (1989 – 1995)

(Primary School Leaving Certificate)

Unilorin Secondary School          (1995 – 1998)

(Junior Secondary School Certificate)

Cherubim & Seraphim College   (1998 -2001)

(Senior Secondary School Certificate)

University of Ilorin                      (2001 – 2006)

(Department of Linguistics & Nig. Languages)

(Bachelor of Art)

Alliance Française D’Ilorin         (2008)

Certificat E’Etudes Françaises

University of Ilorin                     (2008 – 2012)

(Department of Linguistics & Nig. Languages)

(Master of Art)                           (2009 – 2012)

(Department of Linguistics & Nig. Languages)

(Doctor of Philosophy) `            (2013 – 2018)

 

 

Work Experience with Dates:

 

New Era School.

No 28, North-Bank, Makurdi. Benue State.

Date: Aug., 2006 – Aug., 2007

Post Held: Teacher of English Language and

Literature in English (NYSC)

 

Effective Tutors.

No 10, Flower Garden, G.R.A., Ilorin. Kwara State.

Date: Sept., 2007 – Aug., 2008

Post Held: Teacher of English Language and Literature in English

 

Thomas Adewumi International College.

Oko, Omu-Aran. Kwara State

Date: 11th Jan., 2009 – 4th March, 2011

Post Held: Teacher of English Language and Literature in English

(Cambridge IGCSE, TOFEL, SAT)

 

Muslim Community Centre.

Wuse  Zone 2, Abuja.

Date: 11th March., 2011 – 10th Aug., 2013

Post Held: Teacher of English Language and Literature in English

(Cambridge IGCSE, TOFEL, SAT)

 

 

Glorious Vision International School.

Gaa Imam Road, Odota, Ilorin. Kwara State.

Date: 6th Sept., 2013 – 5th November, 2014

Post Held: Head of Lower School, Teacher of English Language and Literature in English

 

Studypays High School.

www.studypays.com

Date: 5th Jan., 2015 – 27th March, 2015.

Post Held: Head of Department, English Language, Teacher of English Language and Literature in English (Cambridge IGCSE, TOFEL, SAT)

 

Little Angelz School

River Valley Estate.

Date: Sept 2015 – July 2016.

Post Held: Head of Lower School, Teacher of English Language and Literature in English

 

Atlantic International University

900 Fort Street.

Honolulu, Hawaii, USA.

Date: August 2016 – till date.

Post Held: Admission Counsellor

 

Extra-Curricular Activities:

 

Organising events, Playing football, basketball, volleyball, badminton, handball, table

tennis, reading, surfing the Internet and researching

Seth Thomas

Seth Thomas

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Data Scientist & Visualisation Expert

Prof. Dr. Waqas Abrar

Prof. Dr. Waqas Abrar

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Dr. Abrar holds PhD in Business Analytics and Operations from the University of Pittsburgh, USA. Moreover, he is a certified chartered accountant (FCCA) from the Association of Chartered Certified Accountants. He has several research papers and academic publications to his credit.

Muzahir Ali

Muzahir Ali

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

I am a professional academic researcher, an academic writer, and a tutor with a PhD in mechanical engineering. Since 2017, i am working remotely worldwide with various private companies’ research organizations, educational institutions, and researchers.

Opoola Tobi Rotimi

Opoola Tobi Rotimi

Position: Academic advisor
Phone: 08037347925
Email: [email protected]
Categories: Academy

OBJECTIVE
To pursue a distinct career, and contribution to the bottom line with opportunity to growth,
increased responsibilities, challenges and be part of an upward dynamic mobile company.

SPECIAL ABILITY
Strong interpersonal skill and ability to work under pressure, with little supervision.

TECHNOLOGIES
Database: Oracle Database (11g), Tools; SQL – plus (language).

SKILLS
1. Project management professionals (In accordance with the PMBOK) standards with
proficiency in the use of MSO project 2007 software).
2. Oracle (11g) Database Administration.
– Installing and creating Oracle database
– Managing the Oracle instance (background process and memory structure)
– Administrating User Account and security
– Managing schema objects e.g. Table, views etc.
– Loading data from Access, Excel, and notepad into Oracle database
– Restoring /flashing Back accidentally deleted table
– Restoring/flashing backup and ill-populated existing tables
– Performing backup and recovering using enterprise manager
– Monitoring and tuning the database

EDUCATIONAL QUALIFICATIONS (WITH DATES)
➢ M.Ed Guidance and counselling (2014)

➢National Youth Service Corps (NYSC) (Arisonia Private College)(2012)

➢B.Ed Guidance and Counselling (University of Ilorin, Ilorin, Kwara State) (2011)

➢West Africa Examination Council (WAEC) (Stephen Fountain of Knowledge) (2007)

➢National Examination Council (NECO)(Stephen Fountain of Knowledge) (2007)

➢Leaving Certification (University of Ilorin Primary School) (2001)

PROFESSIONAL QUALIFICATIONS (WITH DATES)
– Executive Masters in Project Management (2012)
– Oracle (11g) Database Administration (2012)
– Nigeria Institute of Management (chartered) (2012)

EMPLOYMENT RECORD AND EXPERIENCE POST HELD
– Arisonia Private College Teacher 2011
– Jokem Healthcare Services. Ota, Ogun State Marketer 2011
– Youth Aids, Health STL’s Awareness Campaign (YAHSAC) Financial Secretary 2012
– Eucharistic Heart of Jesus Model College ( School Counselor) 2014-2017
– A t l a n t i c I n t e r n a t i o n a l U n i v e r s i t y (Academic Tutor) 2018-2024

Scott Wilson

Scott Wilson

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

William Scott is one of our Academic Advisors at AIU. He holds a Doctorate degree in International Relations & Comparative Politics, a Masters in Political Science, and a Bachelor in Marketing making him an excellent addition to our team of advisors and benefiting those prospective students specializing in these areas of studies.

Education/ Special Training:

            Louisiana State University
PhD Coursework in International Relations & Comparative Politics

West Virginia University
M.A. in Political Science

West Virginia University
B.S.B.A in Marketing

Ohio State University
Summer Institute for Political Psychology

Moscow State University

            Russian Language Instruction

Institute of Culture, Minsk, Belarus
            Lecturer of American Politics

Languages:

English: Good Writing/ Good Conversation

Work/Volunteer Experience:

2004-Present

Atlantic International University
Honolulu, HI

            Academic Advisor            

Ashford University
Clinton, IA
Online Adjunct Faculty Instructor

       Embry-Riddle Aeronautical University
       Daytona Beach, FL
Online Adjunct Faculty Instructor

       Regent University
Virginia Beach, VA
       Online Adjunct Faculty Instructor

Troy University
Troy, AL
Online Adjunct Faculty Instructor

Erika Cervantes

Erika Cervantes

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Native Spanish (Mexican worked for 12 LATAM countries) with English Fluency living in UK who understand the Business needs: Helping your business to build a community that knows exactly why they are there. When we determine exactly who we are talking to, we can make sure we are reaching them.

Andrew Orme

Andrew Orme

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

13 years of experience creating 3D models and technical drawings both for work and leisure. Certified Solidworks Associate. Masters Degree in Mechanical Engineering with focus in manufacturing and quality. Experience with Aerospace, Automotive, Oil and Gas and Industrial applications. Mostly work in Onshape and some sketchup.

Dr. Lucia Gorea

Dr. Lucia Gorea

Position: Academic Advisor
Phone: 1 800 993 0066
Email: [email protected]
Categories: Academy, AIU Staff
Location: Honolulu, United States

  Dr. Lucia Gorea is an award-winning poet, widely published writer, literary translator and English/ESL professor. Lucia is the author of several poetry and English specialty books, such as ESL Games and Classroom Activities-An Interactive Activity Book for All Ages, (Llumina Press), Welcome to America! A Practical Guide to Life Survival Skills, (Authorhouse), and Journey Through My Soul,(First Choice Books), a collection of love and mystical poems. With degrees in Philology, English, French, and Education, Dr. Gorea has taught extensive courses in English Literature and English as a Second Language in universities and colleges across the United States, Canada, and Europe. We at AIU are very proud of having Lucia as part of our faculty.

HIGHLIGHTS OF QUALIFICATIONS:

 

  • Faculty and Academic Advisor at Atlantic International University
  • Teacher Trainer in TESL, Vancouver, Canada
  • More than twenty years’ experience of teaching English/ESL and Education, courses  to adults, as well managing positions such as coordinator, academic advisor and director
  • Language, Literacy and Curriculum developer at Mosaic Language Centre
  • Supervises/Advises  TESL students and helps them with lesson planning and curriculum designs
  • Motivated, enthusiastic, efficient and extremely organized
  • Monitors student progress and submits reports in a timely manner
  • Works extremely well under pressure and without supervision
  • Key note speaker at Language Professionals: The 8th Symposium of Translation, Interpretation and Terminology, Havana, Cuba, 2012: Lost in Translation: Beyond Words
  • Poet and writer of fiction and non-fiction, as well as translator with 14 books published and available on amazon.com and other online book retailers

—————————————————————————————————————————

ACADEMIC EXPERIENCE:

  • Faculty/Academic Advisor – Atlantic International University, USA, 2007-present (online)
  • Lecturer/Faculty – English Language Institute, UBC (Fridays only) 2006- present
  • English Instructor at MOSAIC Language Centres, Vancouver, 2011 – present (online and classroom teaching)
  • TESL Instructor and Curriculum Developer at Western Town College, Vancouver, 2006-2007
  • English Instructor/Director- Portland Community College, Portland, OR   1998-2004 (both online and classroom teaching)
  • English Professor– Marylhurst University, Portland, OR   2000 (online and classroom teaching)

——————————————————————————————————————-

EDUCATION:

  • Ph.D. in English and Education, Atlantic International University
  • B.A/Professional Certification in Teaching English as a Second Language, Canada
  • M.A. /Diploma in English and Philology, University of Bucharest, Romania
  • Society of Translators and Interpreters BC (STIBC) – Certified Translator and Interpreter
  • Canadian Translators, Terminologists and Interpreters Council (CTTIC) Translator and Interpreter
  • ELSA Professional Development, Canada

——————————————————————————————————————————-

PROFESSIONAL CERTIFICATES:

  • TESL Canada, Vancouver, BC
  • CASAS Assessment Workshop for Adult Basic Education Instructors-Salem, Oregon
  • Certificate of Completion – Civics, Oregon Professional Development
  • Certificate of Appreciation for Valuing Diversity and Multiculturalism- Mt. Hood Community College
  • Accent Modification Course for ESL Instructors- Portland, Oregon
  • Heron Books Reading Certificate for Elementary Teachers-Portland, Oregon
  • Heron Books Mathematics Certificate for Elementary Teachers –Portland, Oregon

—————————————————————————————————————————-

 

 

PROFESSIONAL MEMBERSHIPS:

 

  • BC TEAL-Teaching English as a Second Language, Vancouver, BC
  • Federation of Canadian Poets, Toronto, ON

—————————————————————————————————————————–

PUBLISHED BOOKS: Fiction and Non-fiction

 

  • Dracula-Count of Darkness – Historical fiction – Black Opal Books, 2015
  • Yukon, the Polar Bear – Publish America, 2010
  • Speak English for Success – ESL Conversations, Dialogues and Topics, First Choice Books, 2008
  • Journey Through My Soul, Selected Poems, First Choice Books, 2006
  • ESL Games and Classroom Activities. An Interactive Activity Book for All Ages, Llumina Press, 2005
  • Welcome to America! A Practical Guide to Life Survival Skills. Case Studies,  Authorhouse, 2004
  • Poetry and Fairy Tales – Eight literary translations

—————————————————————————————————————————–

COORDINATOR OF MULTICULTURAL EVENTS:

 

  • Founder and host of multilingual/multicultural poetry reading series, Poetry Around the World, at Indigo – West Vancouver, BC
  • Founder and host of multicultural reading series, Poetry Around the World, at  Chapters -Vancouver, BC
  • Coordinator of multicultural workshop at Borders -Beaverton, OR

——————————————————————————————————————

AWARDS:

 

  • Certificate of Appreciation for Excellence in Teaching, Mt. Hood Community College
  • Shakespeare Trophy of Excellence, Famous Poets Society
  • Distinguished Poet and Writer Award, Richmond, BC
  • Outstanding Achievement in Poetry, International Society of Poets
  • Presidents’ Award for Literary Excellence, National Author’s Registry
  • International Poetry of Merit Award, International Library of Poets
  • Editor’s Choice Award, International Library of Poets

—————————————————————————————————————————–

COMPUTER SKILLS:

 

  • Microsoft Word, Adobe Photoshop, Adobe Reader, Microsoft Excel, Microsoft Power Point, Microsoft Front Page, Office Desktop and Surfing the Web

Languages:

        English: Excellent writing / excellent communication

        French: Good writing / Good communication

        Spanish:  Fair writing / Fair communication

        Romanian: Excellent writing / excellent communication

        Hungarian: Good writing / Good communication

         Chinese: Basic Communication

Umar Hassan

Umar Hassan

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

HRM is my core area of expertise including all of my previous degrees from Bachelors, MBA and MS. I am in the final year of my PhD in HRM and I am currently heading the HR Cluster (Program) at our University. I am a resource person for HR certification held here in Pakistan in which I offer 12 hours course spread upon 2 months. Let me know how you would like to proceed with developing a course in HRM

Abdulqader Mohammed Alawi B

Abdulqader Mohammed Alawi B

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Greetings! I am a top-rated chemical engineer on Upwork, bringing a unique blend of academic prowess and hands-on experience to every project. Certified in Aspen HYSYS and armed with a strong command over MATLAB, Excel, and Python, I specialize in process simulation, process optimization, and a wide array of chemical engineering projects.

Gino D’Alessio

Gino D’Alessio

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Más de 20 años de experiencia como Trader/Broker en los mercados financieros, particularmente en Bonos, FX, Derivados y Futuros, amplio conocimiento en Mercados de Valores.

Ronaldo Sosa Cortes

Ronaldo Sosa Cortes

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

I am a Spanish Tutor with over a decade of experience. Part of this expenrience, has been obtained during years of naval career, making institutional communications, memoirs and reports, among other documents. Likewise, during various postgraduate studies

Leticia Lorena Da Costa Leites

Leticia Lorena Da Costa Leites

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Salud y bienestar/Escritora profesional y creativa/ Blogs y articulos

Gonzalo U. Fernández

Gonzalo U. Fernández

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Profesor de cursos de pregrado y posgrado. Investigador en varios campos de estudio y áreas: derecho del trabajo y relaciones laborales, derecho internacional, deuda píºblica, educación, pensamiento crí­tico y latinoamericano

Sophia Petrou

Sophia Petrou

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Graduate of Hellenic College Holy Cross in Brookline, MA, having earned a B.A. degree majoring in Religious Studies and minoring in Ancient Greek, and a Masters of Divinity.

Isabel Bujalance

Isabel Bujalance

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

la Societat Catalana de Terí pia Familiar Col·legiada níºm; 699 Bachelor’s degree Universidad de Girona Master’s degree, social 2014-2015 Homologada per La UdG com Bachelor’s degree 2006-2007 l’Escola Flor de Maig de la Diputació de Barcelona Bachelor’s degree 1984-1987

Kristen Baker-Geczy

Kristen Baker-Geczy

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Experienced public relations specialist with nearly 15 years of industry knowledge and insight. Expertise in: writing and distributing press releases, pitching media, planning and executing public relations campaigns, creating media kits, and branding.

Rosendo Huerta

Rosendo Huerta

Position: Lecturer
Phone: 1 808 993 0066
Email: [email protected]
Categories: Lecturers
Location: United States

Ingeniero Mecánico con más de 35 años de experiencia en consultorí­a y entrenamiento. Ha adiestrado a más de 8000 personas y participado en más de 300 proyectos de diversos sectores industriales. Profesor universitario de pregrado y posgrado. Cuenta con más de 45 publicaciones internacionales.

 

About AIU:

Atlantic International University exists as an institution of experiential learning and non-traditional education at a distance. There are no classrooms and attendance is not required. What makes us unique is the combination of a student “self-instruction” approach (with guidance), the collaborative development of a curriculum that is unique to each student, and the flexibility of time and place of study.

Let us know your goals and aspirations so we can chart a path at AIU to achieve them!
//
Admissions Counselor
Rene Cordon
Available
//
Admissions Counselor
Sandra Garcia-Fierro
Available
//
Admissions Counselor
Boniface Onimu
Available
//
Admissions Counselor
Juan Mejia
Available
//
Admissions Counselor
Prof. Emmanuel Gbagu
Available

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Submit your data.

After submitting, a widget will appear at the bottom-left corner so you can start your training.

Name*

Do you hate spam? Don’t worry, we hate them too. Your email is 100% secure with us.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Submit the form below to begin your interview.

After submitting, a widget will appear at the bottom-left corner so you to start your AI interview.

Name*
Accepted file types: docx, pdf, Max. file size: 500 MB.

Do you hate spam? Don’t worry, we hate them too. Your email is 100% secure with us.